#50937 - 04/15/05 05:25 PM Service work
ToHo Offline
Member
Registered: 12/29/04
Posts: 46
Loc: N.Y.
I looked at a job today where the property management Company wants me to replace a old 4/0 SEU riser cable that is feeding 5 meters.This is a residential 5 unit house.A load calculation must have been submitted previously on the dwelling to allow the 4/0 feed.All 5 meters are ganged together w/ the SEU feeding into the first meter. Each meter then feeds a panel w/ a 60amp main.My question is what is the best way to do the grounding in this situation.The poco doesnt want any grounding in the meters so I have to remove the existing ground. Can I run my #4 ground to the last panel and split bolt taps to each panel.What is confusing me here is a 60amp panel w/ a #4 ground in it.Would taping #6 to each panel from the #4 be the call? The #6 watermain bond would be a split bolt tap to each as well.Any ideas are appreciated..Thanks ToHo
Top
Work Gear for Electricians and the Trades

Member Spotlight
Member Since: 12/24/00
Posts: 4259
New in the Gallery:
SE cable question
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box


Who's Online
0 registered (), 46 Guests and 8 Spiders online.
Key: Admin, Global Mod, Mod
 
New in the Gallery:
SE cable question
 
Top Posters (30 Days)
Admin 47
HotLine1 43
gfretwell 19
Ruben Rocha 12
Trumpy 9
 
Newest Members
Stack, Scotto, Freecrowder, clee512, Jdscott2005

ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals