The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!


2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
Parking lot pole light swap....
by gfretwell
10/24/16 08:46 PM
International Wire Colour Codes
by Tjia1981
10/23/16 12:08 PM
Son of Sparky
by HotLine1
10/20/16 07:43 PM
Speaking of Plugmold ...
by gfretwell
10/17/16 02:37 PM
Broken battery charger? Check for cobwebs!
by gfretwell
10/17/16 02:30 PM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 14
HotLine1 7
ghost307 7
renosteinke 6
Potseal 4
Who's Online
0 registered (), 339 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#43044 - 10/03/04 01:20 PM thru the wall or over the top
sparky 134 Offline

Registered: 09/04/04
Posts: 92
Loc: Joliet, Il, USA
This is a question for the residential electricians that use EMT when roughing walls. In a two story dwelling, do you go thru the top plate of a wall, across the attic space and back down the wall for openings or do you drill the studs ?

I personally go over the top. Some say it uses more material but I argue the savings is in time. Just looking for some opinions....

Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#43045 - 10/03/04 02:40 PM Re: thru the wall or over the top
NJ Wireman Offline

Registered: 08/26/04
Posts: 179
Loc: New Jersey (South Jersey)
Well here in jersey we don't pipe house's but i will say i go up and over with my runs regardles. It allows access later to know where things are when your crawliong in the hot attic in the middle of july? My only change on this is in kitchensand baths. other wise its up and down or down and up if there is a basement or crawl. Sorry i cant help on the pipe part but for romex this is how i do it. i also drill out with a larger hole in the begining to allow for additions later.

#43046 - 10/03/04 04:11 PM Re: thru the wall or over the top
russ m Offline

Registered: 02/22/03
Posts: 165
Loc: Burbank,IL,USA
I'd say for the most part, up and over is the norm. There are times with openings on the same wall space where it's easier to just drll thru the studs.

#43047 - 10/03/04 05:20 PM Re: thru the wall or over the top
Active 1 Offline

Registered: 02/22/03
Posts: 684
Loc: Grayslake IL, USA
I am guessing your talking about open walls and cielings. I would like to drill thru the studs but more often up and over. Not that I can't get a pipe thru most corners of the room it seems easier up and over. Depends how the corners were framed. I try to avoid drilling thru more than 3 2X4 thick if I don't have to. Around some windows it may be a pain to get thru all the wood. I try not to go above doors even if there is no header. Some people don't like it. Then you also have beams and plumbing blocking your way. Up and over really eats up the material. Somewhere of 30' box to box with some scrap left.

When I go box to box I normaly don't go strait out of the side but a min. 90 out of the box. Otherwise your pipe may block a cable jack or other fucture opening. For wood studs I think it is easier to fit together that way.


#43048 - 10/03/04 08:52 PM Re: thru the wall or over the top
DougW Offline

Registered: 06/08/03
Posts: 1083
Loc: North Chicago, IL
"up and over" uses more mats, but takes less time than cutting your sticks to 30" length to fit into drilled horizontal holes.

I've used both in the same house - depends on construction (obstruction is more accurate) and needs of the room.