ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 19
Recent Posts
Anyone hiring inspectors?
by HotLine1. 03/27/17 08:03 AM
Old decora style outlets
by Admin. 03/25/17 11:40 AM
ESA Arc flash course
by TheShockDoctors. 03/24/17 10:15 AM
fuse rejectors
by HotLine1. 03/24/17 07:53 AM
Another Forum Update
by Admin. 03/22/17 03:04 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,629 Are you busy
166,464 Re: Forum
160,718 Need opinion
Who's Online Now
0 registered members (), 52 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#38812 - 06/02/04 05:29 PM 600A Church Service  
DYNAMITE  Offline
Member
Joined: Dec 2003
Posts: 36
Winkler, MB, Canada
Hi I'm a new Contractor (just over a year) and I'm doing a Church with a 600A service with 4 25kW electric furnaces.
What would be the best (and most economical) way to do this service?
any ideas?


Work Gear for Electricians and the Trades

#38813 - 06/02/04 05:49 PM Re: 600A Church Service  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
From 600 amp metering out to three 200 amp main breaker panels.

I think that would be the least money in equipment.

It also provides 126 poles right from the start.

Just my guess. [Linked Image]

Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts

#38814 - 06/02/04 06:39 PM Re: 600A Church Service  
DYNAMITE  Offline
Member
Joined: Dec 2003
Posts: 36
Winkler, MB, Canada
How can you put 4- 107 amp furnaces in those panels. Correct me if I'm Wrong but you wouldn't put more than 1 per 200a panel.
Also they might even upgrade to 30kW(128A) furnaces.


#38815 - 06/02/04 07:36 PM Re: 600A Church Service  
CDN_ELECTRICIAN  Offline
Member
Joined: Jan 2003
Posts: 73
Concord,Ontario,Canada
DYNAMITE

This is assuming the feeders are 120/240 1 phase 3 wire?

Without knowing if there is any space limitations, your best option would probably be:

600 Amp Main fused Disconnect > 600 amp splitter
install 4 x 200 amp fused disconnects off above splitter, wired from splitter to load side @ 200 amp and fuse for smaller units. (if upgrade on furnaces happen then it's only a fuse change
Then come off splitter distribution panel (you can use the tap rule to keep panel size down, so it dose not need to be 600 amp. i.e. depending on load and circuits required maybe a panel with 400 or 225 amp mains will be good)


#38816 - 06/02/04 08:08 PM Re: 600A Church Service  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
DYNAMITE.

I assumed 3 phase - 480, sorry. [Linked Image]


Bob Badger
Construction & Maintenance Electrician
Massachusetts

#38817 - 06/02/04 08:13 PM Re: 600A Church Service  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
CDN_ELECTRICIAN

Why would you need the 600 Amp Main fused Disconnect?

If the power company wants / allows hot sequence metering the main is not needed.


Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts

#38818 - 06/02/04 10:24 PM Re: 600A Church Service  
Bjarney  Offline
Moderator
Joined: Apr 2002
Posts: 2,527
West-Southern Inner-Northeast ...
The biggest influence is probably the serving utility’s metering compartment and underground pull-section dimensions. Guessing 208V 3ø, with four 90-amp furnace branch circuits. Each furnace: (25,000W/208V/1.732)*1.25 = 87 amperes… Rough guess 600A 300V class-T fused main and a 225A-bus panel/feeder for everything else.


#38819 - 06/02/04 11:15 PM Re: 600A Church Service  
DYNAMITE  Offline
Member
Joined: Dec 2003
Posts: 36
Winkler, MB, Canada
240V single phase service in Canada.It's to bad I can't run 4 200A combimation panels straight from the CSTE, I really didn't want to use Switches for each furnace


#38820 - 06/02/04 11:21 PM Re: 600A Church Service  
caselec  Offline
Member
Joined: Apr 2002
Posts: 558
San Jose, CA
If I was designing this job I would use a free standing switchboard which contained a pull section, CT compartment and distribution section. The distribution section could contain the 4 breakers for the heaters and 1 or 2 breakers supplying the panels for other loads. If less then 6 breakers are installed a main disconnect would not be needed. This would also make the grounding electrode/bonding very easy since you would just need to connect 1 panel.

From reading these forums over the past couple of years I see where things like this get done very differently around the country and Canada. Apparently it is cost effective to build a service like this in some areas but I couldn’t even purchase the materials for the cost of having a switchboard built. The only way I would every build something like is if I didn’t have time to wait for the gear to be build. I can usually get something like this in 3-4 weeks (sooner for more $$$) but seldom is the equipment needed for a new building that quickly.

Curt


Curt Swartz

#38821 - 06/03/04 06:40 AM Re: 600A Church Service  
winnie  Offline
Member
Joined: Sep 2003
Posts: 649
boston, ma
Dumb question:

How would the costs change if you split the service, with a higher voltage service drop for the heaters and a 120/240V drop for your general lighting load? Is 575V available at the location; this would take the currents way down into the manageable range [Linked Image]

Separate question, and probably not the domain of the sparky involved; why 100KW of electric heat??? We are probably talking $10K-$30K USD for the electric bill to run these heaters, unless they are run very infrequently. I would think that something fuel burning, or a heat pump system, would be more cost effective over time; though I've never thought in terms of heating large buildings.

-Jon


Page 1 of 2 1 2

Member Spotlight
lil suzi
lil suzi
Midwest
Posts: 57
Joined: August 2003
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.023s Queries: 15 (0.004s) Memory: 0.8160 MB (Peak: 0.9904 MB) Zlib enabled. Server Time: 2017-03-28 10:04:58 UTC