#25145 - 04/26/03 09:21 PM Just another day in California
deenjiee Offline
Junior Member
Registered: 04/26/03
Posts: 1
Loc: California
This is a humorous situation one faces living a day in the life of a California Electrician.

In lieu of the recent 16x16 addition on a residential project, the existing 100 amp meter/combo did not meet the required 36" of horizontal working space. As a result, the homeowner wanted to take the opportunity and upgrade to a 200 amp service and relocate it to the Northwest corner of the addition. The new upgraded service is about 18' away from the existing one that currently feeds the residence.

The installation is complete in order to energize and transfer the load from the existing to the new, so I thought.

The local authority came out, checked the work, but said I wasn't ready for him to "Release Power" since I hadn't energized the new service yet.

I was then instructed to cut the Service Laterals feeding the existing service - at the point of attachment and jumper them to the upgraded service 18' away. I also needed to jumper between the line side of the upgraded meter's vertical contacts to temporarily feed the service until the utility company can permanently install the meter. At one point I was told, once I cut the energized Service Laterals (from the Utility side) I could even "wrap" the conductors around the large tree branch nearby to relieve the triplex conductor's tension. And the conductors I was to use for this jumper could be left on the roof until everything was switched over.

Say..what?

Huh,

Don't worry - I've simplified the whole process with a few phone calls. Wouldn't you know that it may just be easier for the Utility company to move there own laterals, ONCE, rather than adding jumpers here and there to end up with the same result. Sometimes I worry - a lot about what goes on out there and is deemed acceptable.

That's my story for today, I'd be interested in hearing about some of the 'other' situations taking place out there.
_________________________
Deenjiee
Top
Work Gear for Electricians and the Trades
#25146 - 04/27/03 05:44 AM Re: Just another day in California
txsparky Offline
Member
Registered: 05/25/01
Posts: 578
Loc: Magnolia,.Texas U.S.A.
Wow ! As if having to deal with earthquakes,fires ,and mudslides wasn't enough.
_________________________
Donnie
Top
#25147 - 04/27/03 07:30 AM Re: Just another day in California
electure Offline


Member
Registered: 12/24/00
Posts: 4229
Loc: Fullerton, CA USA
It sounds like your AHJ is off his/her rocker.
"Releasing Power" is generally an acknowledgement that the service is ready to be energized.
(I had an AHJ that wouldn't give us a final or release power until he saw "everything running". It was hard to convince him that the 277/480 3Ø system wouldn't work off of the 120/240 temp service. He made me rent a generator...and I'm still mad)...S
Top

Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box

Recent Posts
Looking for older post
by sparkyinak
Today at 12:27 AM
License exam
by TRUE POWER
Yesterday at 11:33 PM
Members: Non-Members: Did you know?
by Admin
Yesterday at 02:34 PM
Safety at heights?
by HotLine1
01/21/17 08:51 PM
International Wire Colour Codes
by Texas_Ranger
01/21/17 03:29 PM

Who's Online
2 registered (Admin, HotLine1), 90 Guests and 13 Spiders online.
Key: Admin, Global Mod, Mod
New in the Gallery:
Desk-mounted "power-board"
Top Posters
gfretwell 9066
Trumpy 8560
pauluk 7693
HotLine1 6833
sparky 5545
Member Spotlight
Tom
Tom
Member Since: 01/01/01
Posts: 1069

ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals