ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 19
Recent Posts
Anyone hiring inspectors?
by Admin. 03/26/17 02:42 PM
Old decora style outlets
by Admin. 03/25/17 11:40 AM
ESA Arc flash course
by TheShockDoctors. 03/24/17 10:15 AM
fuse rejectors
by HotLine1. 03/24/17 07:53 AM
Another Forum Update
by Admin. 03/22/17 03:04 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,518 Are you busy
166,223 Re: Forum
160,664 Need opinion
Who's Online Now
0 registered members (), 70 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#23597 - 03/22/03 08:09 AM Assistant Chief Operator in a Power Plant  
Joe Tedesco  Offline
Member
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA
Question:

What are the duties of an:

"Assistant Chief Operator in a Power Plant?"

Do they use the National Electrical Code, or do they use the National Electrical Safety Code?

If not, what code do they use in a Power Plant?

Are Power Plants Covered in the NEC?



[This message has been edited by Joe Tedesco (edited 03-22-2003).]


Joe Tedesco, NEC Consultant

Work Gear for Electricians and the Trades

#23598 - 03/22/03 03:57 PM Re: Assistant Chief Operator in a Power Plant  
WebSparky  Offline
Member
Joined: Feb 2003
Posts: 138
Cleveland, Ohio
Hi Joe,

Not under the NEC.

Based on NEC 2002,
90.2(B)(5)
Installations under the exclusive control of an electric utility where such installations
c.
Are on property owned or leased by the electric utility for the purpose of ....generation......of electricity.

IMO

Dave

[This message has been edited by WebSparky (edited 03-22-2003).]


Dave

#23599 - 03/22/03 05:12 PM Re: Assistant Chief Operator in a Power Plant  
rat4spd  Offline
Member
Joined: Mar 2003
Posts: 29
Waterloo, Ia
Hmmm, since you asked, I haven't looked at the official job description lately, but here's a summary:

Operate all electrical, mechanical, hydraulic, steam and air systems in a safe manner compliant with the mission of the plant in the generation of steam and electricity. Be aware of any and all parameters involved in the operation, correct any deviations, ensure training and safety are in compliance with local procedures. And since this is a state owned University, Students First. Plus we co-generate with the local utility, so VARS are to kept on our side.

BTW, Joe, Sorry to stir things up.

[This message has been edited by rat4spd (edited 03-22-2003).]



Member Spotlight
HappyElectrician
HappyElectrician
Penn USA
Posts: 31
Joined: December 2011
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 14 (0.003s) Memory: 0.7501 MB (Peak: 0.8730 MB) Zlib enabled. Server Time: 2017-03-26 20:40:20 UTC