The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
Texas_Ranger 8
sparkyinak 7
Potseal 6
Who's Online
0 registered (), 92 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#23111 - 03/11/03 11:04 PM Job Specifications
txsparky Offline
Member

Registered: 05/25/01
Posts: 578
Loc: Magnolia,.Texas U.S.A.
Many of you have proably already seen this.

Supplementary General Conditions

Article 1
The work we want performed is clearly indicated on the attached plans and specifications. The Architect, who has had plenty of college, has spent a lot of time drawing up these plans and specifications, but nobody can think of everything. Once your bid is submitted to the Owner-that's it brother! From then on, anything wanted by the Architect, the Owner, or any of his friends, or anybody else except the Contractor shall be considered as shown, specified, intended, or implied, and shall be provided by the Contractor without any expense to anyone except the Contractor.
Article 2

If the work is done without extra expense to the Contractor, then the work will be taken down and done over again until the extra expense to the Contractor is satisfactory to the Architect.
Article 3

The contract drawings are intended to be correct. If drawn wrong it should be discovered by the Contractor, corrected, and done right at his own expense. It won't cut any ice with the Owner or the Architect if the Contractor points out the mistakes which the Architect has drawn on the plans.
Article 4

The Contractor is not supposed to make fun of the Architect, his plans, or specifications. If he does, then the same consequence shall apply as stated in Article 3 above.
Article 5

Any Contractor walking around the job site with a smile on his face will be subject to a review of his bid.
Article 6

If the Contractor doesn't find all the Architect's mistakes prior to making his bid on this job, or if he doesn't have enough sense to know that the Architect is going to think up a bunch of new stuff that has to be done before the job can be deemed complete, then the Contractor shall provide any such items without extra expense to the Owner or Architect.
Article 7

Any evidence of satisfaction on the part of the Contractor shall be considered as just cause for withholding final payment.
_________________________
Donnie

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#23112 - 03/12/03 12:55 AM Re: Job Specifications
Scott35 Offline

Broom Pusher and
Member

Registered: 10/19/00
Posts: 2724
Loc: Anaheim, CA. USA
Dude, that's Frikken Hilarious!!!

Talk about perfect timing! Printed it to give to some very sweet boneheads!!!

Scott35 S.E.T.
_________________________
Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!

Top
#23113 - 03/12/03 06:11 AM Re: Job Specifications
sabrown Offline
Member

Registered: 12/12/02
Posts: 297
Loc: Ogden, Utah, USA
I hope you do not mind if I plagerize this and add it to our spec's directory. I wonder if someone will notice it.

Top
#23114 - 03/12/03 05:51 PM Re: Job Specifications
Ron Offline
Member

Registered: 03/13/02
Posts: 577
Loc: White Plains, NY
The General Conditions doesn't include bowing upon entrance of the Architect, and bringing dounuts to each meeting?
It's ok to beatup the Architects, but leave the engineers alone.
_________________________
Ron

Top
#23115 - 03/12/03 05:57 PM Re: Job Specifications
golf junkie Offline
Member

Registered: 04/22/01
Posts: 511
Loc: York, NE
Thanks txsparky!

That ought to provide a few grins at next weeks progress meeting.

GJ

Top



ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals