The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Forum Software Upgrade coming soon...
by Ruben Rocha
Today at 07:36 PM
ESA Arc flash course
by frank
Today at 04:25 PM
Re: Fabricating Guards out of Lexan?
by frank
Yesterday at 04:11 PM
Would ELV branch circuits be a good idea?
by gfretwell
Yesterday at 01:26 PM
Why cables look like they do
by Texas_Ranger
Yesterday at 12:33 PM
New in the Gallery:
Desk-mounted "power-board"
Top Posters (30 Days)
Webmaster 27
HotLine1 21
Ruben Rocha 16
Trumpy 12
ghost307 12
Who's Online
2 registered (Webmaster, sparkyinak), 0 Guests and 223 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 2 1 2 >
Topic Options
Rate This Topic
#2204 - 06/27/01 05:11 PM Another "do you" loop wires
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
On a RX job, do you go straight into a box, or leave a service loop outside of it??


Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#2205 - 06/27/01 06:12 PM Re: Another "do you" loop wires
Redsy Offline
Member

Registered: 03/28/01
Posts: 2138
Loc: Bucks County PA
Sparky,

Are you referring to some slack cable (service loop)outside the box?

Top
#2206 - 06/27/01 06:40 PM Re: Another "do you" loop wires
armelect Offline
Junior Member

Registered: 06/23/01
Posts: 7
Loc: Doylestown,Pa.
New construction I`v always came straight in, but old work i may leave a loop.

Top
#2207 - 06/27/01 06:44 PM Re: Another "do you" loop wires
Fred Offline
Member

Registered: 04/30/01
Posts: 461
Loc: Straughn, IN 47387
I always pulled the romex so I had 12" sticking out of the device box, stapled it 6" from where it entered the box, then pulled back a "bubble" leaving 6" extending free from the front of the box. Just in case the drywallers hooked a wire and chewed it up.

Top
#2208 - 06/28/01 03:17 AM Re: Another "do you" loop wires
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
Redsy;
yes, for the same reason Fred mentions, as well as the possible movement of boxes due to 11th hour redesigns.


Top
#2209 - 06/28/01 06:39 AM Re: Another "do you" loop wires
Joe Tedesco Offline
Member

Registered: 10/07/00
Posts: 3325
Loc: Boston, Massachusetts USA
And --- you can be sure the next guy 30 years from now will say nice things about you for the extra slack, especially after the previous 6 owners clipped the wires shorter than 6 inches!

I always left slack in the space above the ceiling.

[This message has been edited by Joe Tedesco (edited 07-28-2002).]
_________________________
Joe Tedesco, NEC Consultant

Top
#2210 - 06/28/01 07:04 AM Re: Another "do you" loop wires
Redsy Offline
Member

Registered: 03/28/01
Posts: 2138
Loc: Bucks County PA
Is there any code reference on this? I don't think so, but, someone I know insists there is. He can't find it though.

Top
#2211 - 06/28/01 04:01 PM Re: Another "do you" loop wires
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
Redsy,
there is for every wiring method, 336-18 asks to secure 12" before box entry, so we just move the staple closer to the box and take advantage of this.
Of interest, kinda goes with Joe's response would be 336-12 EX #2, which is actually asking for a 'loop' .


Top
#2212 - 06/28/01 04:31 PM Re: Another "do you" loop wires
sparky66wv Offline
Member

Registered: 11/17/00
Posts: 2342
Loc: West Virginia
OK, I thought I had read somewhere that it said something like "...12 inches as measured along the length of the cable..." but I'll be dipped if I can find it. (I have been looking...)

Perhaps it was in the ROP's?

This little difference would render the extra cable as a violation, no matter how close the staple was...

_________________________
-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI

Top
#2213 - 06/28/01 05:23 PM Re: Another "do you" loop wires
Redsy Offline
Member

Registered: 03/28/01
Posts: 2138
Loc: Bucks County PA
Quote:
Originally posted by sparky:I know the exception you are referring to, however, I believe this pertains to a special type of device that requires no box. I saw a picture of them once. You leave a loop of rx sticking out of the wall and use a special tool to install the switch or receptacle onto the cable. I think I saw it in a code handbook sometime, but never in the flesh.
Redsy,
there is for every wiring method, 336-18 asks to secure 12" before box entry, so we just move the staple closer to the box and take advantage of this.
Of interest, kinda goes with Joe's response would be 336-12 EX #2, which is actually asking for a 'loop' .


Top