The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by sparkyinak
Yesterday at 06:29 PM
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 10
sparkyinak 9
Texas_Ranger 8
Potseal 6
Who's Online
0 registered (), 200 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
access1.jpg
Access ??
Image Details
Poster HotLine1 Offline
Posted 08/13/15 07:19 PM
Description
Same whse as the rail mounted panel. Interesting blockage of troff!!
Dimensions 1200x900
Size 157.18 KB
UBBCode
Thumbnail
Medium
Full

Comments
#215909 - 08/14/15 05:11 AM Re: Access ?? [Re: HotLine1]
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9045
Loc: Estero,Fl,usa
I guess the question is whether these service conductors are "likely to require examination, adjustment, servicing, or maintenance while energized".
They are certainly not accessible in the 110.26 sense.
They may pass the article 100 test.
_________________________
Greg Fretwell

Top
Super Rod Cable Installation Tools

Super Rod Cable Rod System
Super Rod Cable Rod System -
Voted
Best Product of the Last 50 Years by members of NICEIC

#215915 - 08/14/15 10:51 AM Re: Access ?? [Re: gfretwell]
LarryC Offline
Member

Registered: 07/05/04
Posts: 776
Loc: Winchester, NH, US
Why the multiple meters?

Is this a multi-tenant building?

Top
#215920 - 08/14/15 07:27 PM Re: Access ?? [Re: HotLine1]
HotLine1 Offline

Member

Registered: 04/03/02
Posts: 6805
Loc: Brick, NJ USA
LarryC:

Yes, this is a multi tenant whse/office building. I don't have any info on the water meters as of yet.

I was surprised to find this, and apparently it's been like this for quite some time. This is the same bldg. as the rail mounted panel in another pic here.
_________________________
John

Top
#215921 - 08/14/15 07:33 PM Re: Access ?? [Re: HotLine1]
HotLine1 Offline

Member

Registered: 04/03/02
Posts: 6805
Loc: Brick, NJ USA
Greg:

No debate on Article 100 rules, as it would have to be cut at the primary side of the padmount to 'work' on it.

My point is 'surprise', how the heck did this happen??

Makes you think if a 'Stevie Wonder' did the H20 inspection.

Did you see the rail mount panel pic?? Same place.
_________________________
John

Top
#215951 - 08/17/15 05:47 PM Re: Access ?? [Re: HotLine1]
LarryC Offline
Member

Registered: 07/05/04
Posts: 776
Loc: Winchester, NH, US
Speaking of water, why is there no bonding jumper around any of the water meters?

Top
#215952 - 08/17/15 06:30 PM Re: Access ?? [Re: HotLine1]
HotLine1 Offline

Member

Registered: 04/03/02
Posts: 6805
Loc: Brick, NJ USA
Larry:
If you look at this pic, and the panel on the rail, it looks like some unpermitted work was done. That said, this whole mess is 'dated'; except the upper water meter which must have been recently replaced.

I will have a chat with the bldg. owner to have a little attention done to this when I get back from vacation.

Bottom line would be confirm condition of grounding and bonding, install some close-ups, & provide support for the panel. That's about all I can expect, until they have to touch the service.