Anyone out there have horror stories about generators? Here in NJ people are installing them everywhere. In one town alone, I have already inspected almost 60 gens. in just 2 months. That doesn't even count what we did last year. The poor EC's out there are getting different answers about the gens in different towns. Some EC's can't get past the permit stage in some towns. Keep in mind that these are just Optional stand by systems. Not required systems.
Top
2017 / 2014 NEC & Related Books and Study Guides
#209013 - 03/03/13 10:10 AM Re: Generators [Re: harold endean]
gfretwell Online   content


Member
Registered: 07/20/04
Posts: 9039
Loc: Estero,Fl,usa
There is a North Carolina inspector on one of the other BBs (InspectPA) who makes a case that virtually none of these homeowner grade generator installations are legal. (No breaker interlocks, no unlisted generators etc) On the other hand he has no problem with just about anything you can do with cords (hot wiring the furnace fan etc)

We had an interesting discussion and just agreed to disagree
_________________________
Greg Fretwell
Top
#209016 - 03/03/13 12:45 PM Re: Generators [Re: harold endean]
shortcircuit Offline
Member
Registered: 06/27/04
Posts: 608
Loc: massachusetts
1 gen-set I had to straighten out was a generac 17kw unit an installer had placed 18inches from the dwelling...which is allowed with their listed unit...but he had the exhaust end pointing at the dwelling!

The gas was hard piped into the unit without the 12inch flex hose.

The SE rated transfer switch didn't have the GEC relocated to it.

The grounds and neutrals were not seperated at the now sub-panel.

They used 18-6 bell wire for the controll, utility sense wiring.

Top
#209032 - 03/04/13 06:22 AM Re: Generators [Re: harold endean]
harold endean Offline
Member
Registered: 02/16/02
Posts: 2233
Loc: Boonton, NJ
I have heard that one town here in my county won't allow the genset to be installed anymore. They claim that there is not enough gas pressure to go around. Another town did the same thing but only on 1 street.
Top
#209039 - 03/04/13 08:44 AM Re: Generators [Re: harold endean]
shortcircuit Offline
Member
Registered: 06/27/04
Posts: 608
Loc: massachusetts
Not enough gas? I never thought of that Harold. But if you think about it, all those generators add up to alot of fuel consumption.

But, would a property owner be able to hook up a gen-set to their own propane storage tank?
Top
#209041 - 03/04/13 11:09 AM Re: Generators [Re: harold endean]
HotLine1 Offline


Member
Registered: 04/03/02
Posts: 6776
Loc: Brick, NJ USA
The natural gas issue is important. One case of a resi gen that started & ran, but...the neighbors standing pilot lights all went out resulting in a no heat issue, broken pipes & a damaged (water) basement as no one was in that home.

We have a 'load calc' that has to be submitted to PSE&G (Gas & Electric Utility) and another that goes to Elizabethtown Gas, depending on the area for gas utility.

Yes, whole house gens are plentiful. I don't have a count on the permit apps just for gens, but we are over 1000 for jan & Feb.

_________________________
John
Top
#209074 - 03/06/13 06:28 AM Re: Generators [Re: harold endean]
harold endean Offline
Member
Registered: 02/16/02
Posts: 2233
Loc: Boonton, NJ
Another horror story I heard was an EC went to install a genset and the zoning officer wanted a survey of the property as to where the genset was going to be placed. OK, the EC said, I will draw up a plan. The Zoning officer said NO. He wanted a survey signed and sealed by a land surveyor. The EC said that it could cost over $1000, but the zoning officer didn't care. No survey, no genset.
Top
#209075 - 03/06/13 06:32 AM Re: Generators [Re: harold endean]
HotLine1 Offline


Member
Registered: 04/03/02
Posts: 6776
Loc: Brick, NJ USA
Harold:
FWIW, the first stop for anyone applying for a permanent gen install, is our Zoning Officers Office. A COPY of a survey is required, indicating the proposed gen location. This is required for setback dimensions.

After Zoning, they come to the Building (Construction) Dept for Fire, Elec, Plumb & Building Permit apps.

_________________________
John
Top
#209078 - 03/06/13 06:39 AM Re: Generators [Re: harold endean]
harold endean Offline
Member
Registered: 02/16/02
Posts: 2233
Loc: Boonton, NJ
John,

Will your town accept a hand drawn survey or do they require signed and sealed survey?
Top
#209086 - 03/06/13 10:00 AM Re: Generators [Re: harold endean]
gfretwell Online   content


Member
Registered: 07/20/04
Posts: 9039
Loc: Estero,Fl,usa
They want a plot plan here but not a stamped survey
_________________________
Greg Fretwell
Top
Page 1 of 3 1 2 3 >

Member Spotlight
Member Since: 12/24/00
Posts: 4259
New in the Gallery:
SE cable question
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box


Who's Online
2 registered (gfretwell, sparkyinak), 53 Guests and 10 Spiders online.
Key: Admin, Global Mod, Mod
 
New in the Gallery:
SE cable question
 
Top Posters (30 Days)
Admin 49
HotLine1 43
gfretwell 18
Ruben Rocha 12
Trumpy 9
 
Newest Members
Freecrowder, clee512, Jdscott2005, FAIZAN, Regitest2

ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals