The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Temporarily feeding a panel...
by renosteinke
09/29/16 05:10 PM
Locked rotor, no burnout
by jraef
09/29/16 01:18 PM
Massive power outage South Australia
by Meadow
09/29/16 06:46 AM
short circuit??
by Meadow
09/29/16 06:43 AM
Norwegian power?
by Meadow
09/29/16 06:36 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
HotLine1 13
sparky 10
sparky66wv 8
gfretwell 8
Potseal 6
Who's Online
1 registered (mbhydro), 296 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#207472 - 10/30/12 08:34 PM Cover requirements for UF
sparkync Offline
Member

Registered: 10/17/02
Posts: 811
Loc: NC
Seems like I'm on a "roll" here for post. This job I'm on is bringing up a lot of questions. I always hear that the ditch for UF cable is 18", but from what I see in Table 300.5, unless it's under one of the special conditions in the table ( concrete etc.), it is 24". Everybody I've ever heard just about, says it's 18". A customer just told me one of the DIY books said 18". Am I missing something here. I've heard this all my years in electrical work, but as I read the code, regular underground depth is 24". Thanks again.

Top
2014 / 2011 NEC & Related Books and Study Guides
#207473 - 10/30/12 08:41 PM Re: Cover requirements for UF [Re: sparkync]
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9012
Loc: Estero,Fl,usa
24 unless you can meet one of the other conditions.
Most notably is 12" for a single 120v, 15-20a GFCI circuit at a residence.
18" is RNC (PVC) conduit, a better choice for a lot of reasons.
_________________________
Greg Fretwell

Top
#207475 - 10/30/12 09:05 PM Re: Cover requirements for UF [Re: sparkync]
wewire2 Offline
Member

Registered: 11/14/02
Posts: 246
Loc: California
UF = Usually Fails.

Top
#207477 - 10/31/12 06:22 AM Re: Cover requirements for UF [Re: sparkync]
mbhydro Online   content
Member

Registered: 02/21/03
Posts: 340
Loc: Winnipeg MB Canada
Where I am in Canada, its 18 inches if protected (wood covering or poly pipe) and 2 feet if not.

This is for non vehicle areas where it has to be deeper.

Top
#207482 - 10/31/12 10:30 AM Re: Cover requirements for UF [Re: sparkync]
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9012
Loc: Estero,Fl,usa
"Wood"????
_________________________
Greg Fretwell

Top
#207488 - 10/31/12 05:55 PM Re: Cover requirements for UF [Re: sparkync]
mbhydro Online   content
Member

Registered: 02/21/03
Posts: 340
Loc: Winnipeg MB Canada
Yes sir, treated (non creosote)lumber 2x4 or 2x6

see page 13 & 14 of the h/o brochure from our city.
http://winnipeg.ca/ppd/pdf_files/HOElec.pdf

Top
#207491 - 10/31/12 07:28 PM Re: Cover requirements for UF [Re: sparkync]
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9012
Loc: Estero,Fl,usa
That must be a Canadian thing. The typical .40 or .25 CCA or ACQ "treated" lumber would be stringy dust here in less than 10 years underground.
_________________________
Greg Fretwell

Top
#207497 - 10/31/12 09:22 PM Re: Cover requirements for UF [Re: sparkync]
mbhydro Online   content
Member

Registered: 02/21/03
Posts: 340
Loc: Winnipeg MB Canada
In 1969 my folks built a new garage and after it was inspected and passed, they decided to put power into it for a few outlets and lights.

I can vividly remember my mother tossing the painted 1x6 boards from when they took the fence down into the trench to protect the cables. I inherited the house so one day I should dig down and see how much of the "protection" is still intact.

Most dyi's use the plastic pipe as protection as its easier to buy it at the big box and put a roll in the back of their car.

Top



ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals