Sprinklered equipment 26-008
by bigpapa
Yesterday at 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 15
HotLine1 10
Trumpy 8
Texas_Ranger 8
sparkyinak 7
Who's Online
0 registered (), 107 Guests and 5 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#206345 - 06/17/12 06:38 PM Really into his work!!
HotLine1 Offline

Member

Registered: 04/03/02
Posts: 6804
Loc: Brick, NJ USA
Solar grid tie in switchgear.

_________________________
John

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#206384 - 06/25/12 02:43 PM Re: Really into his work!! [Re: HotLine1]
sparkync Offline
Member

Registered: 10/17/02
Posts: 811
Loc: NC
Hope the switchgear is not hot. I was actually on a job one time and saw the electrician tie a rope around his waist and crawled into a HOT switch gear to do maintenance. He said the rope was for " EMERGENCY USE" just in case he didn't come out frown I guess he thought he was tough, but I call it stupid and foolish.

Top
#206385 - 06/25/12 04:50 PM Re: Really into his work!! [Re: HotLine1]
HotLine1 Offline

Member

Registered: 04/03/02
Posts: 6804
Loc: Brick, NJ USA
sparkync:

NO, this faciliy was in utilit shutdown for a solar gridtie.

With the existing conditions prevnting access other than him slithering into the rear of the gear, this was the only choice.

Safety is paramount; SOP is that after inspection by AHJ, and POCO inspector, everyone is cleared out before the line crew re-energizes the line side of the service.