The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by bigpapa
Yesterday at 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 15
HotLine1 10
Trumpy 8
Texas_Ranger 8
sparkyinak 7
Who's Online
1 registered (gfretwell), 218 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#201021 - 05/03/11 09:14 PM Subpanel et AFCI requirement.
frenchelectrican Offline

Member

Registered: 02/06/03
Posts: 938
Loc: Wi/ Paris France { France for ...
Hey guys I think I may ran into sticky issue due one of my customer set up they want me to clean up the panel box I know I have it inspected before it was loaded with twinners but what the customer want me to do is get rid of twinners and go with single pole full size but the catch is that if I move a bit of circuits over to subpanel that part of the code that will required AFCI breaker ?

Keep in your mind with this part it is not adding any new circuits just clean up the panel so how do the codes stand on that when you transfer it over to the subpanel.

{ I may go back in Wisconsin for very short time so I just want to be prepared for it }

Merci,
Marc
_________________________
Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)


Top
2014 / 2011 NEC & Related Books and Study Guides
#201022 - 05/04/11 06:23 AM Re: Subpanel et AFCI requirement. [Re: frenchelectrican]
HotLine1 Offline

Member

Registered: 04/03/02
Posts: 6804
Loc: Brick, NJ USA
Marc:
I can tell you the NJ scenario, but Wi may be different.

What you are proposing to do in NJ would fall under our 'Rehab' section of the UCC (Uniform Construction Code, as follows:

You are reworking existing circuits.
'Existing' is under 'Rehab'
'Rehab' is based on the 2005 NEC here, until the State updates the 'Rehab' section of the UCC.
We (NJ) did not require AFCI under the adopted version of the 2005 NEC.

Best suggestion is talk to the local (Wi) AHJ before you get into it.

Take care & travel safe.
_________________________
John

Top
#201035 - 05/04/11 10:46 PM Re: Subpanel et AFCI requirement. [Re: HotLine1]
frenchelectrican Offline

Member

Registered: 02/06/03
Posts: 938
Loc: Wi/ Paris France { France for ...
John.,

Merci for your infomation on that part and I will double check with my inspector for the latest info if any change between that time.

Merci,
Marc
_________________________
Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)


Top



ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals