Temporarily feeding a panel...
by Potseal
09/29/16 01:29 PM
Locked rotor, no burnout
by jraef
09/29/16 01:18 PM
Massive power outage South Australia
by Meadow
09/29/16 06:46 AM
short circuit??
by Meadow
09/29/16 06:43 AM
Norwegian power?
by Meadow
09/29/16 06:36 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
HotLine1 13
sparky 10
sparky66wv 8
gfretwell 8
Vlado 6
Who's Online
3 registered (Potseal, gfretwell, jraef), 103 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#201021 - 05/03/11 09:14 PM Subpanel et AFCI requirement.
frenchelectrican Offline

Member

Registered: 02/06/03
Posts: 938
Loc: Wi/ Paris France { France for ...
Hey guys I think I may ran into sticky issue due one of my customer set up they want me to clean up the panel box I know I have it inspected before it was loaded with twinners but what the customer want me to do is get rid of twinners and go with single pole full size but the catch is that if I move a bit of circuits over to subpanel that part of the code that will required AFCI breaker ?

Keep in your mind with this part it is not adding any new circuits just clean up the panel so how do the codes stand on that when you transfer it over to the subpanel.

{ I may go back in Wisconsin for very short time so I just want to be prepared for it }

Merci,
Marc
_________________________
Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)


Top
2014 / 2011 NEC & Related Books and Study Guides
#201022 - 05/04/11 06:23 AM Re: Subpanel et AFCI requirement. [Re: frenchelectrican]
HotLine1 Offline

Member

Registered: 04/03/02
Posts: 6785
Loc: Brick, NJ USA
Marc:
I can tell you the NJ scenario, but Wi may be different.

What you are proposing to do in NJ would fall under our 'Rehab' section of the UCC (Uniform Construction Code, as follows:

You are reworking existing circuits.
'Existing' is under 'Rehab'
'Rehab' is based on the 2005 NEC here, until the State updates the 'Rehab' section of the UCC.
We (NJ) did not require AFCI under the adopted version of the 2005 NEC.

Best suggestion is talk to the local (Wi) AHJ before you get into it.

Take care & travel safe.
_________________________
John

Top
#201035 - 05/04/11 10:46 PM Re: Subpanel et AFCI requirement. [Re: HotLine1]
frenchelectrican Offline

Member

Registered: 02/06/03
Posts: 938
Loc: Wi/ Paris France { France for ...
John.,

Merci for your infomation on that part and I will double check with my inspector for the latest info if any change between that time.

Merci,
Marc
_________________________
Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)


Top