The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!


2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
Parking lot pole light swap....
by gfretwell
Yesterday at 08:46 PM
International Wire Colour Codes
by Tjia1981
10/23/16 12:08 PM
Son of Sparky
by HotLine1
10/20/16 07:43 PM
Speaking of Plugmold ...
by gfretwell
10/17/16 02:37 PM
Broken battery charger? Check for cobwebs!
by gfretwell
10/17/16 02:30 PM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 14
ghost307 7
HotLine1 7
renosteinke 6
Potseal 4
Who's Online
0 registered (), 299 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
More sloppyness at BK
Image Details
Poster wa2ise Offline
Posted 02/05/10 04:06 PM
This picture didn't come out that clearly, but look carefully and you'll see wire nut connections just above the plastic light defusser plastic sheet in this ceiling light fixture. This at the same BK I posted that picture with the bad ceiling outlet with the extension cord running to up above the suspended ceiling... We probably don't want to know what else is above the ceiling tiles...
Dimensions 369x234
Size 12.14 KB

#192308 - 02/06/10 10:42 AM Re: More sloppyness at BK [Re: wa2ise]
HotLine1 Offline


Registered: 04/03/02
Posts: 6792
Loc: Brick, NJ USA
This may be the 'handi work' of a ballast changer??

Super Rod Cable Installation Tools

Super Rod Cable Rod System
Super Rod Cable Rod System -
Best Product of the Last 50 Years by members of NICEIC

#192335 - 02/08/10 05:12 PM Re: More sloppyness at BK [Re: HotLine1]
aussie240 Offline

Registered: 07/06/05
Posts: 221
Loc: Blue Mountains, NSW, Australia
Reminds me of when all the PCB filled phase correcting capacitors were changed in the lights at my place of work.
The new polyester film capacitors had different mounting arrangements of course. Naturally, the contractors weren't going to waste time installing new mounting clips with several hundred light fittings to be done. So the capacitors were simply left resting on the cover plate to dangle down by their leads when the cover is taken off.

#192484 - 02/15/10 06:17 PM Re: More sloppyness at BK [Re: aussie240]
Trumpy Offline


Registered: 07/05/02
Posts: 8532
Loc: SI,New Zealand
Yeah Aussie,
I remember in the early stages of my electrical apprenticeship working on troffers with the old PCB ballasts.
I seem to remember how nice it was that the manufacturers (Thorn, I think) rivetted the ballasts to the top of the troffer body.
One morning I was working in the editorial office of our local newspaper, removing these ballasts and replacing them with wire-wound ballasts.

The first person into the office that morning turned on all the lights, so that when I turned up, the ballasts were too hot to touch, let alone hold while you drilled the rivets out.
One other thing I remember too, was that the wiring they used inside the troffers had a habit of having it's insulation go brittle, due to the heat inside the fitting.
I only had to be taught that lesson once, as the place had to have as many lights on as possible as the staff were proof-reading and checking colours and what-not as I worked.

For a split second, they had all the light they needed, when I took the cover off one of the troffers.
The insulation fell off all of the wires and shorted to the troffer case. mad
Let's face it, these days if you're not young, you're old - Red Green grin

#192521 - 02/16/10 06:09 PM Re: More sloppyness at BK [Re: Trumpy]
HotLine1 Offline


Registered: 04/03/02
Posts: 6792
Loc: Brick, NJ USA
You're bring back memories....
Opening up a fixture & finding the 'real old' ballast still inside, with a 'newer' one stuffed in. was kind of commonplace when someone didn't want to dispose (legally) of the PCB ballast. It was a real pain in the butt on the 8', 2 lamp 96 channels too.

#192527 - 02/16/10 07:32 PM Re: More sloppyness at BK [Re: HotLine1]
frenchelectrican Offline


Registered: 02/06/03
Posts: 938
Loc: Wi/ Paris France { France for ...
I have see that issue couple time when doing the troubleshooting and someone stuff very old school ballast and never bother take it out and few luminaire I did work on it did show a bow line so I knew i will be running hevey luminiare ballast { try to find old 25 HZ ballast then you will get the idea }

Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)


ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals