The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
Texas_Ranger 8
sparkyinak 7
Potseal 6
Who's Online
0 registered (), 92 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#19047 - 12/19/02 10:34 AM Job Bidding
FatDog65 Offline
Junior Member

Registered: 03/23/02
Posts: 6
Loc: Paxton IL
What are some of the ways everyone is bidding jobs, residential & commercial. How much per opening, etc.

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#19048 - 12/19/02 03:26 PM Re: Job Bidding
HotLine1 Offline

Member

Registered: 04/03/02
Posts: 6804
Loc: Brick, NJ USA
Most comm is done the old fashioned way, a take off from the plans.....
The per opening thing works for a "plain vanilla box" type job, but anything with any detail gets the take off.

We don't do resi, so I can't comment inteligently. Most of the resi guys I know do the "piece" for the builders and $$$ for the "extras".
John
_________________________
John

Top
#19049 - 12/20/02 01:38 PM Re: Job Bidding
The Watt Doctor Offline
Member

Registered: 12/23/01
Posts: 443
Loc: Mont Belvieu, TX
I'm with Hotline. The only way to do it right is by doing a detailed take off.
I can't speak for resi because I haven't really been involved with it that much.

Regards,
Doc
_________________________
The Watt Doctor
Altura Cogen
Channelview, TX

Top
#19050 - 12/20/02 04:45 PM Re: Job Bidding
golf junkie Offline
Member

Registered: 04/22/01
Posts: 511
Loc: York, NE
OK guys,
I've seen this mentioned several times about detailed take offs. When we do commercial bids we count openings for lights and general use receptacles. When you do a detailed take off for general use ckts. do you estimate conduit and wire by the foot, plus openings???

Our current project has approximately 8,000 openings. It took two men two days just to count the openings........I can't imagine the time it would take to try and detail this stuff.

We do detail out special equipment, ckts., HVAC, feeders, etc.

Just curious,
GJ

Top
#19051 - 12/20/02 05:31 PM Re: Job Bidding
CTwireman Offline
Member

Registered: 02/07/02
Posts: 839
Loc: Connecticut, USA
GJ,

Estimating is a full time job!!

When I was learning to estimate, each "opening" would be taken off and entered into the estimating program as an assembly. For instance, 1 receptacle would include one 4" box with strap, mud ring, 2 #10 screws, a ground pigtail, a receptacle, plate, 40' 3/4"EMT (or MC cable, depending), and 120' #12 THHN.

So yes, in my experience, every foot of conduit and wire is counted.

Hope this helps.

Peter
_________________________
Peter

Top
#19052 - 12/20/02 06:18 PM Re: Job Bidding
arseegee Offline
Member

Registered: 01/28/02
Posts: 321
Loc: Statesboro, GA USA
I work commercial like GJ. I figure degree of difficulty on the general openings (exposed work, ceiling height, structural design). Then I adjust my price scale to fit the job.

Line item on the rest, service, AC, motors and so forth.

Resi is priced by 120v openings, low voltage, 240v drops and service entrance. No pricing by the sqft.

Top
#19053 - 12/20/02 07:57 PM Re: Job Bidding
golf junkie Offline
Member

Registered: 04/22/01
Posts: 511
Loc: York, NE
"When I was learning to estimate, each "opening" would be taken off and entered into the estimating program as an assembly. For instance, 1 receptacle would include one 4" box with strap, mud ring, 2 #10 screws, a ground pigtail, a receptacle, plate, 40' 3/4"EMT (or MC cable, depending), and 120' #12 THHN. "

CT,
OK, you then have figured your material cost for an opening assembly. How is that different than pricing by the opening? I guess it makes the computer happy?

GJ



[This message has been edited by golf junkie (edited 12-20-2002).]

Top
#19054 - 12/20/02 07:59 PM Re: Job Bidding
golf junkie Offline
Member

Registered: 04/22/01
Posts: 511
Loc: York, NE
Arseegee,

That is exactly how we do it too. Works for me.

GJ

Top
#19055 - 12/20/02 09:07 PM Re: Job Bidding
CTwireman Offline
Member

Registered: 02/07/02
Posts: 839
Loc: Connecticut, USA
GJ, yeah, I guess I misinterpreted your question. Oh well...


Peter

[This message has been edited by CTwireman (edited 12-21-2002).]