The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by sparkyinak
Yesterday at 03:17 PM
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
Texas_Ranger 8
sparkyinak 8
Trumpy 6
Who's Online
0 registered (), 261 Guests and 5 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#188484 - 08/11/09 10:46 AM BC adopts 2009 CEC
mikesh Offline
Member

Registered: 06/07/06
Posts: 614
Loc: Victoria, BC, Canada
As of August 10, 2009 the 2009 CEC is in effect and contractors may work under either code until October 10, where the 2009 code takes full effect. Contractors may not mix and match codes but can chose 1 or the other during the 2 months.

Top
2014 / 2011 NEC & Related Books and Study Guides
#188491 - 08/11/09 02:52 PM Re: BC adopts 2009 CEC [Re: mikesh]
dougwells Offline

Member

Registered: 05/03/03
Posts: 1228
Loc: kamloops BC Canada
Originally Posted By: mikesh
As of August 10, 2009 the 2009 CEC is in effect and contractors may work under either code until October 10, where the 2009 code takes full effect. Contractors may not mix and match codes but can chose 1 or the other during the 2 months.


Thanks

Good thing we have this forum as i would of not known this today

Top
#188510 - 08/13/09 01:03 AM Re: BC adopts 2009 CEC [Re: dougwells]
jackolsen Offline
Member

Registered: 02/11/08
Posts: 21
Loc: british columbia canada
Thanks for the heads up knew it was coming just not when.I hear that we will have less bc amendments.Also has anyone
heard how much time will be required(up grades each year) to
keep our Fsr?

Top
#188515 - 08/13/09 10:48 AM Re: BC adopts 2009 CEC [Re: jackolsen]
dougwells Offline

Member

Registered: 05/03/03
Posts: 1228
Loc: kamloops BC Canada
Originally Posted By: jackolsen
Thanks for the heads up knew it was coming just not when.I hear that we will have less bc amendments.Also has anyone
heard how much time will be required(up grades each year) to
keep our Fsr?


There is some info here.

http://www.electrical-contractor.net/for...tinu#Post184357

Top
#188516 - 08/13/09 10:54 AM Re: BC adopts 2009 CEC [Re: jackolsen]
mikesh Offline
Member

Registered: 06/07/06
Posts: 614
Loc: Victoria, BC, Canada
FSR will require 24 hours every code cycle or about 8 hours of approved training per year. The trick is to determine what training will be recognized. The local BCSA inspectors have regular Teck talks which offer free 2 hour sessions once a month on varying subjects as 1 source for these credits. A 2 day Arc Flash seminar would get you 16 hours in 1 shot.
I can see there could be a challenge for some FSR to get the 24 hours especially once they have waded through 1 or 2 upgrade courses.