The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 10
Texas_Ranger 8
Trumpy 8
sparkyinak 7
Who's Online
1 registered (LongRunner), 206 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 4 1 2 3 4 >
Topic Options
Rate This Topic
#1839 - 06/04/01 05:53 PM 150 A Service
Redsy Offline
Member

Registered: 03/28/01
Posts: 2138
Loc: Bucks County PA
Does anyone (besides me) install 150 Amp services? On a small home with gas appliances and a 60 Amp service, which needs an upgrade for central air, the load calculations still fall shy of even the minimum 100 amp mandated by code. I won't install only 100, but 200 seems excessive for such small homes. Some people feel that the materials dont cost much more for 200 than 150, so install 200. Others feel differently. Anyone?

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#1840 - 06/04/01 06:22 PM Re: 150 A Service
golf junkie Offline
Member

Registered: 04/22/01
Posts: 511
Loc: York, NE
Some people feel that the materials dont cost much more for 200 than 150, so install 200.

200 it is.

GJ

Top
#1841 - 06/04/01 06:24 PM Re: 150 A Service
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
I have not found a wide gap in material prices from 150 to 200 as far as the chief components.

The big $$$$ come from long service laterals, or overhead distance spec's from the utilities ( wanting another pole due to wire size/distance)


Top
#1842 - 06/04/01 06:58 PM Re: 150 A Service
Bill Addiss Offline
Member

Registered: 10/07/00
Posts: 4196
Loc: NY, USA
Redsy,

Some people will never use the capacity of a 200A service and do not want the extra cost, I've noticed that too. I would give them the option. Most times it's not much difference from 150 to 200 though. If there happens to be a long or difficult run to the water main and there is a #6 copper in place already it wouldn't have to be replaced for a 150A service. Put that together with a long SEU run and it could mean a significant difference in price.

Bill

Top
#1843 - 06/04/01 07:11 PM Re: 150 A Service
Anonymous
Unregistered


>If there happens to be a long or difficult run to the water main and there is a #6 copper in place already it wouldn't have to be replaced for a 150A service.
Okay, you got me there. Why does it have to be replaced for a 200 A service?

Top
#1844 - 06/04/01 07:28 PM Re: 150 A Service
Fred Offline
Member

Registered: 04/30/01
Posts: 461
Loc: Straughn, IN 47387
In my area we have only one supply house in the county and they handle ITE loadcenters. A 200A 30-40 ct. copper buss indoor loadcenter runs $147.00. A 150A loadcenter runs $180.00. A 100A 30 ct. loadcenter runs $110.00. They tell me the demand pretty much regulates the prices. They also sell a 5/8" x 8' ground rod for $2.00 less than a 1/2" x 8'. They simply sell more 5/8" rods.

Top
#1845 - 06/04/01 07:30 PM Re: 150 A Service
Bill Addiss Offline
Member

Registered: 10/07/00
Posts: 4196
Loc: NY, USA
DS,

The 200A service needs a #4 to the water main.

Bill

Top
#1846 - 06/04/01 07:35 PM Re: 150 A Service
Anonymous
Unregistered


I knew you were going to say that. I wanted to know why. Is this true even if it is not being used as an electrode?

In my area, most houses have private wells.

Top
#1847 - 06/04/01 09:20 PM Re: 150 A Service
Bill Addiss Offline
Member

Registered: 10/07/00
Posts: 4196
Loc: NY, USA
I've not seen any situation where it was not used as part of the Electrode system. Are you saying that Wells don't have to be bonded and become part of the electrode system?

Top
#1848 - 06/04/01 09:38 PM Re: 150 A Service
Anonymous
Unregistered


Are you saying that Wells don't have to be bonded and become part of the electrode system?

I say that if you drive two rods 6' apart outside and bond to them, you don't have to count the water main as an electrode requiring #4 copper.

Indoor plumbing must be bonded, e.g., metal pipes, tanks, control boxes, and pumps.

Outdoor wells can't normally be bonded as the pipe is usually black plastic (PE) and the casing is PVC.
I have never bonded to a well.