ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 19
Recent Posts
Anyone hiring inspectors?
by HotLine1. 03/27/17 08:03 AM
Old decora style outlets
by Admin. 03/25/17 11:40 AM
ESA Arc flash course
by TheShockDoctors. 03/24/17 10:15 AM
fuse rejectors
by HotLine1. 03/24/17 07:53 AM
Another Forum Update
by Admin. 03/22/17 03:04 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,643 Are you busy
166,537 Re: Forum
160,725 Need opinion
Who's Online Now
0 registered members (), 62 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#175817 - 03/11/08 10:30 PM 'Temporary' Transformer Hookup  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,437
NY, USA
Quote
Hows this for temporary?

This Trani blew a few yrs back. Now they won't give us a shut down to replace it.

- Leland

[Linked Image]

[Linked Image]


Tools for Electricians:

#175897 - 03/14/08 03:53 AM Re: 'Temporary' Transformer Hookup [Re: Admin]  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,211
SI,New Zealand
OK then,
Now, who is responsible for this mess?
You have an open panel with terminals exposed.

So, "they" won't let you shut this down?
What does this transformer supply?
Even more to the point, who are "they"?
There is absolutely no reason why something like this cannot be shut down, anyone who says to the contrary, is dreaming.

Just my opinion.


Let's face it, these days if you're not young, you're old - Red Green grin

#175910 - 03/14/08 02:00 PM Re: 'Temporary' Transformer Hookup [Re: Admin]  
LarryC  Offline
Member
Joined: Jul 2004
Posts: 781
Winchester, NH, US
Is that a breaker panel that reaches all the way down to the floor? It looks like the bottom breakers are only 12" from the floor.

Larry C


#175939 - 03/15/08 12:35 PM Re: 'Temporary' Transformer Hookup [Re: LarryC]  
sparkyinak  Offline
Member
Joined: Jul 2007
Posts: 1,313
Alaska
Customers are willing to pay a high price to be cheap. Years ago, a couple of co-workers went to investigate a transformer at a foundry. It was a oil filled can like the POCO's use on poles. The lid blew off and half the oil boiled off and the customer wanted to know if they can keep running it that way. I do not believe they were running 24/7 operations at the time. They just did not want give up the money. Even when money is tight, you think it was a no brainer.


"Live Awesome!" - Kevin Carosa

#175940 - 03/15/08 12:36 PM Re: 'Temporary' Transformer Hookup [Re: LarryC]  
leland  Offline
Member
Joined: Aug 2007
Posts: 853
Lowell area, Ma. USA
Mike, A world renouned college, Known for its Engineering wonders of the world. (Big dome )

This is a distribution panel for 120/240 lab panels a and class rooms. RE; shut down, your right.
The bottom line is they don't want to pay OT!!.

Larry, we have the 12" at the bottom.

This is a 225 KVA 480-240. My surprise, 2002!!!! 6 YEARS!!!
I guess their priority is the students.


#175941 - 03/15/08 12:38 PM Re: 'Temporary' Transformer Hookup [Re: leland]  
sparkyinak  Offline
Member
Joined: Jul 2007
Posts: 1,313
Alaska
I work for the government. 6 years is still considered temporary. smile


"Live Awesome!" - Kevin Carosa

#175942 - 03/15/08 12:56 PM Re: 'Temporary' Transformer Hookup [Re: sparkyinak]  
leland  Offline
Member
Joined: Aug 2007
Posts: 853
Lowell area, Ma. USA
Originally Posted by sparkyinak
I work for the government. 6 years is still considered temporary. smile


You aint kidding!! Temporarily permanent!


#175981 - 03/17/08 04:18 AM Re: 'Temporary' Transformer Hookup [Re: leland]  
Texas_Ranger  Offline
Member
Joined: Dec 2001
Posts: 2,392
Vienna, Austria
In Austria they say temporary solutions usually last longer than permanent ones... in 1892 the city built a temporary subway station (temporary becaus it was close to a bridge scheduled for a major redesign and they planned to build the permanent station after the bridge work was completed). The temporary station lasted until about 1960... the permanent station built afterwards was demolished again in 1978. So that makes 68 years for the temp solution and 28 for the permanent... nice, huh?


#176082 - 03/19/08 09:58 PM Re: 'Temporary' Transformer Hookup [Re: leland]  
Elviscat  Offline
Member
Joined: Aug 2005
Posts: 214
Seattle Washington USA
Considering the U I think this is, it makes it all the more funny, not exactly an engineering or technological masterpiece.

-Will


#176095 - 03/20/08 11:58 AM Re: 'Temporary' Transformer Hookup [Re: leland]  
SteveFehr  Offline
Member
Joined: Mar 2005
Posts: 1,198
Chesapeake, VA
Originally Posted by leland
Mike, A world renouned college, Known for its Engineering wonders of the world. (Big dome )

This is a distribution panel for 120/240 lab panels a and class rooms. RE; shut down, your right.
The bottom line is they don't want to pay OT!!.

Larry, we have the 12" at the bottom.

This is a 225 KVA 480-240. My surprise, 2002!!!! 6 YEARS!!!
I guess their priority is the students.
I've see the same situation more times than I care to count... our problem isn't cost though (well, not always) but unwillingness to schedule downtime. Hey, power's still flowing so it might be OK, right??


Page 1 of 2 1 2

Member Spotlight
The_Lightman
The_Lightman
Orlando, Fl, USA
Posts: 49
Joined: August 2001
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.023s Queries: 16 (0.004s) Memory: 0.8173 MB (Peak: 0.9998 MB) Zlib enabled. Server Time: 2017-03-28 14:00:10 UTC