Calling all Non-US members!! (Non-US only)
by aussie240
Today at 02:39 AM
Photo Upload Tutorial
by DanK
Yesterday at 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
New in the Gallery:
12.5A through 0.75mm▓ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
Texas_Ranger 8
sparkyinak 7
Trumpy 6
Who's Online
0 registered (), 282 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 3 1 2 3 >
Topic Options
Rate This Topic
#168075 - 08/26/07 04:05 PM I am wiring a taco bell
Clydesdale Offline
Member

Registered: 11/25/04
Posts: 139
I am wiring a taco bell. On Tueseday of last week, my project manager handed me prints for a taco bell. Has anyone else here had experience on these projects that could give me a few tips to make the job run smoothly? I have had a crew of 4 guys for 3 days, and had 8 on Saturday. So far we have pretty much gotten out of the walls with the line voltage stuff. The low voltage is next, and ultimately the service. The GC is breathing down my neck because he says he's already a week behind schedule, but I am assuming I had nothing to do with it seeing as I only arrived on the scene this past Tueseday. Ran into a few problems already(what else is new right?). It seems as though our guys/the concrete guys didn't run pipe in the slab prior to pouring. Looks as though I'm gonna be going overhead for the lighting contactor(it's located on the opposite wall from the lighting panel on the print), and the voice/data feeder conduits. Anyway, I'll keep you guys posted on how things are progressing, and like I said....if anyone here has had experience with a similar project, let me know...thanks...

Nick

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#168077 - 08/26/07 05:16 PM Re: I am wiring a taco bell [Re: Clydesdale]
renosteinke Offline
Cat Servant
Member

Registered: 01/22/05
Posts: 5305
Loc: Blue Collar Country
Check your prints and contract real carefully! Such chain places are typically very detailed, telling you exactly where each and every wire will be run. You do not get to vary from them. If the GC dropped the ball .... don't let him off the hook. CYA.

Top
#168087 - 08/26/07 06:55 PM Re: I am wiring a taco bell [Re: renosteinke]
ITO Offline
Member

Registered: 11/26/06
Posts: 341
Loc: Texas
Everything Reno said, plus not only are they picky but an owners rep will be inspecting it.

Also look for anything that has to go in the slap like a floor box or a feeder to an island, if there is the GC needs to sawcut the floor for you.

BTW not to discourage you but I HATE restaurants they are full of MEP all competing for the same space.

One more thing I have never met a GC who was not behind schedule, don't let him rattle your cage too much.
_________________________
101┬░ Rx = + /_\

Top
#168120 - 08/27/07 12:36 PM Re: I am wiring a taco bell [Re: ITO]
jdevlin Offline
Member

Registered: 08/07/02
Posts: 402
Loc: welland ontario canada
Topic is two years old. I sure he is finished by now.


Edited by jdevlin (08/27/07 12:37 PM)

Top
#168123 - 08/27/07 01:05 PM Re: I am wiring a taco bell [Re: jdevlin]
walrus Offline
Member

Registered: 07/25/02
Posts: 671
Loc: Bangor Me. USA
the date on the post is 8/26/07 ??

Top
#168130 - 08/27/07 01:41 PM Re: I am wiring a taco bell [Re: walrus]
mahlere Offline
Member

Registered: 11/17/05
Posts: 514
Loc: New Jersey
devlin if from the future:D

Top
#168182 - 08/28/07 02:42 PM Re: I am wiring a taco bell [Re: mahlere]
jdevlin Offline
Member

Registered: 08/07/02
Posts: 402
Loc: welland ontario canada
DOH.
I looked the registration date instead of the post date.

Top
#168188 - 08/28/07 04:26 PM Re: I am wiring a taco bell [Re: jdevlin]
mahlere Offline
Member

Registered: 11/17/05
Posts: 514
Loc: New Jersey
well, you best go find out who's gonna win this years NBA finals, World Series and SuperBowl...all day I've been telling people I know someone from the future...there's a lot of money riding on this:D

Top
#168320 - 08/31/07 08:21 PM Re: I am wiring a taco bell [Re: Clydesdale]
Clydesdale Offline
Member

Registered: 11/25/04
Posts: 139
Thanks for the input.

Yeah...the GC has been telling me he's behind schedule. I told him I can only go as fast as I can. Fortunately I have a great crew of guys on my side. So far the office has been very supportive. This is my first time running work, and let me tell you, my head is spinning.
We passed the wall inspection yesterday, although I still had to get some pipes outside for the parking lot lights, and informed the inspecter. He seemed unphased by this. My guys made sure everything was nice and neat which helped out a lot. So far I have been giving them "options" on what task they would like to do next, and this technique seems to be working out just fine. Are there any managerial techniques anyone can suggest? I really enjoy making the rounds and seeing the project come together. I still keep a fully loaded tool belt on at all times though, so when I see the guys needing help I jump right in. At the end of the day today, I unwound a bit, by chizling out some of the foundation for some pipes. It was nice not to think for a little while.

Thanks again for the input

Nick

Top
#168324 - 08/31/07 09:10 PM Re: I am wiring a taco bell [Re: Clydesdale]
macmikeman Offline
Member

Registered: 07/16/02
Posts: 718
Loc: Honolulu, Hawaii
I used to do a good deal of resturant buildouts (chains) and one thing I remember is that it is a good idea to get an extra conduit or two stubbed up from the panels into the ceiling, cause there is always something that the prints leave out, and your company will be the first one they call in for the extra stuff they want installed in the coming months. So now you will be halfway there and won't have to fish down into the panels.

Top