ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 17
Recent Posts
Old decora style outlets
by Admin. 03/25/17 11:40 AM
ESA Arc flash course
by TheShockDoctors. 03/24/17 10:15 AM
fuse rejectors
by HotLine1. 03/24/17 07:53 AM
Another Forum Update
by Admin. 03/22/17 03:04 PM
Dining room plugs
by watersparkfalls. 03/21/17 10:31 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,432 Are you busy
166,150 Re: Forum
160,606 Need opinion
Who's Online Now
0 registered members (), 80 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#160916 - 03/27/07 06:19 PM Not to bring up a bad subject...but  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,799
Brick, NJ USA
Are there any localities/states that have made an amendment to accept 8x8 reinforcement wire for the equipotential grid around a pool??
We have a 'buzz' going around here in NJ, but nothing official, in writing yet that I'm aware of.

John


John

2017 / 2014 NEC & Related Books and Study Guides

#160953 - 03/27/07 11:31 PM Re: Not to bring up a bad subject...but [Re: HotLine1]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,057
Estero,Fl,usa
Florida is bouncing that around as we speak. Most are saying no.


Greg Fretwell

#160964 - 03/28/07 07:23 AM Re: Not to bring up a bad subject...but [Re: gfretwell]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,799
Brick, NJ USA
Greg:
I thought I saw that somewhere on the threads, Thanks.

A few pool contractors (EC's) over the last few days said the state (NJ) had a 'memo' out. I have not seen it, nor has anyone else.

Do the guys in your area have the pool builder do it, or does the EC 'build' the grid? My opinion, it should be part & parcel of the pool builder, and the EC should be responsible to properly install the bond.

John


John

#160976 - 03/28/07 11:25 AM Re: Not to bring up a bad subject...but [Re: HotLine1]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,057
Estero,Fl,usa
The way we are starting to see the grid here is they keep coming with the #3 rebar up past the tie beam on the pool shell, 3' out for the pool deck.
http://i153.photobucket.com/albums/s201/inspector830/Picture004.jpg

Last edited by gfretwell; 03/28/07 11:29 AM. Reason: add link

Greg Fretwell

#161205 - 03/31/07 12:37 PM Re: Not to bring up a bad subject...but [Re: gfretwell]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,799
Brick, NJ USA
I don't know....three (3) replies, AND 344 views?????

Anyone else have any comments???

Guess Greg & I are IT????

John

Last edited by HotLine1; 03/31/07 12:38 PM. Reason: add

John

#161226 - 03/31/07 04:59 PM Re: Not to bring up a bad subject...but [Re: HotLine1]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,057
Estero,Fl,usa
I don't think most people have really read all of the changes to 680 and actually figured out what it means. I know it seemed like a shock to Florida once they actually read it (after adoption of course)
The new requirement does use the word "rods" (608.23(C)(1)) and that does preclude wire mesh. This is being revisited in 2008 and it may allow a single ring of 8 copper to bpnd the deck mesh. Around here we don't even see that much mesh. It is fiber in the concrete.


Greg Fretwell

#161281 - 04/01/07 08:29 AM Re: Not to bring up a bad subject...but [Re: HotLine1]  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
Originally Posted by HotLine1
I don't know....three (3) replies, AND 344 views?????


I am one of the views but I really do not know much about this subject.

Article 680 is not one I feel very confident commenting on.



Bob Badger
Construction & Maintenance Electrician
Massachusetts

#161295 - 04/01/07 11:36 AM Re: Not to bring up a bad subject...but [Re: iwire]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,799
Brick, NJ USA
Bob:
A truly wise man speaks only on familiar items.

Thank you.

PS: I'm not a 680 'maven' either, but it's turning into a hot topic here.

John


John

#161409 - 04/02/07 09:14 PM Re: Not to bring up a bad subject...but [Re: HotLine1]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,057
Estero,Fl,usa
It will get revisited in 2008 and if I read the ROC right we will be able to bond the deck with a single #8 copper loop, connected to the shell in 4 places. The depth of this wire sounds a bit confusing to me. What does
Quote
4-6" below sub grade
mean?


Greg Fretwell

#161432 - 04/03/07 12:31 AM Re: Not to bring up a bad subject...but [Re: gfretwell]  
ausador  Offline
Member
Joined: Mar 2007
Posts: 49
Central Florida
4-6" below the grade of the pool deck of course. The pool deck being the finished grade and the sub grade being the bottom of the pool deck.


Page 1 of 2 1 2

Member Spotlight
TOOL_5150
TOOL_5150
Bay Area
Posts: 61
Joined: August 2007
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.018s Queries: 16 (0.002s) Memory: 0.8188 MB (Peak: 0.9994 MB) Zlib enabled. Server Time: 2017-03-25 17:34:18 UTC