Anyone know of a good method of testing cat-3/5/6 WITHOUT the final terminations?

Normaly I terminate one side (The blocks), then check open, then have someone go strip em, and short em, then check short. Current job is not going to have the blocks installed until final.
_________________________
Mark Heller
"Well - I oughta....." -Jackie Gleason
Top
Study Guides for VDV / Structured Cabling Installers
#160407 - 01/12/06 08:37 PM Re: Cabling testing prior to termination
gfretwell Offline


Member
Registered: 07/20/04
Posts: 9039
Loc: Estero,Fl,usa
You really aren't testing much until they are terminated in the keystones and buttoned up. You also need a data tester. Testing really goes beyond simple continuity.
You can cross a pair or screw up the twists and get continuity just fine. It would open the garage door, ring the doorbell or even work for the phone but it won't move much data.


[This message has been edited by gfretwell (edited 01-12-2006).]
_________________________
Greg Fretwell
Top
#160408 - 01/13/06 02:07 PM Re: Cabling testing prior to termination
hbiss Offline
Member
Registered: 12/16/03
Posts: 886
Loc: Hawthorne, NY USA
Really at this point all you ARE testing for is opens and shorts in the wire. I have never done this but I suppose if the wire runs will be buried with no easy way to replace it it can give some you peace of mind. And true, with data runs you can still have major problems that can't be found until the run is terminated and tested.

I also don't think there is any way to do this other than what you are doing. I would probably also check for shorts to ground. Never know when a run might be ripped on a metal stud.

Just out of curiosity how many bad runs have you actually found? Wonder if just being more careful would eliminate this testing which is pretty time consuming if there are a lot of runs.

-Hal
_________________________
www.myphonetechs.com
Top
#160409 - 01/13/06 04:53 PM Re: Cabling testing prior to termination
e57 Offline
Member
Registered: 05/27/03
Posts: 2876
Loc: S.F.,CA USA
In Commercial I usually don't worry at all> (Unless certification is required, at which point everything is terminated and fully tested. Bag the tombstones and stuff in the wall...) And often cielings are accessable...

In residential, I check, when there are doubts. Especially if other trades are late, like plumbers, framers, and if I have some green guy that just can't control his own strength, and cant seem to beat it into him that wire abuse is not nice. It seems I have all of the above on current project. With the above circumstances, over the years I have found some interesting things. Plumbers solder pipe next to cables, melting whole bundles. Framers make a few changes and go through cable with a sawsall... Once caught a new guy swinging from the rafters like Tarzan from a bundle of cable. Yeah, new job, GC, Subs and helper dude.
_________________________
Mark Heller
"Well - I oughta....." -Jackie Gleason
Top

Member Spotlight
Member Since: 04/03/02
Posts: 6776
New in the Gallery:
SE cable question
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box


Who's Online
0 registered (), 36 Guests and 10 Spiders online.
Key: Admin, Global Mod, Mod
 
New in the Gallery:
SE cable question
 
Top Posters (30 Days)
Admin 47
HotLine1 43
gfretwell 19
Ruben Rocha 12
Trumpy 9
 
Newest Members
Scotto, Freecrowder, clee512, Jdscott2005, FAIZAN

ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals