The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by twh
Today at 06:28 AM
On Delay Relay with Auto Reset
by Potseal
Yesterday at 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 15
HotLine1 10
Trumpy 8
Texas_Ranger 8
sparkyinak 7
Who's Online
2 registered (jraef, LongRunner), 188 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#160292 - 10/05/05 08:57 PM Fiber Certification
GalwayElectric Offline
Member

Registered: 09/22/05
Posts: 14
Loc: Rutherford, NJ
Hey all!

I'm a residential, commericial, and industrial electrician. I have minimal experience with Cat 3, 5, etc... and even less experience with Fiber. My question is:

Is there any class/certification in regards to these types of wiring?
I hear the mention of fiber back bones for token ring setups and things of that nature. What's the best way to learn all the rules and appropriate way to do this type of work?

Any help would be appreciated. Thanks guys!

Top
Study Guides for VDV / Structured Cabling Installers
#160293 - 11/11/05 05:45 AM Re: Fiber Certification
HaskinsElectric Offline
Junior Member

Registered: 11/10/05
Posts: 1
Token Ring is over, nobody would consider upgrading an existing TR network. Vendors such as Leviton, AMP and others offer weekend training and certification courses.

Top
#160294 - 11/11/05 10:21 AM Re: Fiber Certification
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9045
Loc: Estero,Fl,usa
Token Ring is out of style, simply because it doesn't have the speed of newer Ethernet but if you are making something where reliability is your goal it is still a valid technology. It usually takes 2 failures to crash a ring because the data can go the other way. There are no collisions so throughput is more constant. The media is also more noise tolerant and the slower speed more forgiving.
I run Ethernet every day because I handle large multimedia files but if I had a critical application without a need for blinding speed it would be T/R.
_________________________
Greg Fretwell

Top
#160295 - 11/11/05 12:07 PM Re: Fiber Certification
mkoloj Offline
Member

Registered: 01/03/05
Posts: 134
Loc: NNJ\NYC
Double Post

[This message has been edited by mkoloj (edited 11-11-2005).]

Top
#160296 - 11/11/05 12:15 PM Re: Fiber Certification
mkoloj Offline
Member

Registered: 01/03/05
Posts: 134
Loc: NNJ\NYC
I have heard Token Ring\Ethernet broken down like this:

Token Ring is like traveling by train, the packet of data waits at the station until the train comes at which time it gets on and goes where it needs to, if you miss the train you wait until the next one comes by.

Ethernet is like traveling on the highway you wait at the entrance until there is a free spot that you will fit into and you get on and go with the flow which is constantly moving in an endless stream of data.

As for training in fiber you can take a look at LightBrigade.com they have a course called Fiber Optics 1-2-3 that I am interested in taking possibly in March 06 when it comes to my area. Also just about every manufacturer has courses to certify you for their product. I know leviton has a course geared towards their residential product line. http://www.bluevolt.com/training/lin/CourseDetailsWiring.aspx

Top
#160297 - 11/11/05 01:37 PM Re: Fiber Certification
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9045
Loc: Estero,Fl,usa
Ethernet is really like blind guys coming to an intersection. If nobody is coming they can go on through but if there is another car in the intersection there is a "collision" and everyone is in the penalty box for a while. The adapters time out at different rates until everyone stacked up gets through. In a small network with a few users that is not a problem but the more users trying to get on, the better chance for another collision.
The use of "switches" vs "hubs" helps this problem by holding the bus until the current user is done.

The token is like the train in your example but if nobody is at the trolley stop it goes around pretty fast so you don't wait long. You do get to send your packet when you get the token and it will get through.
_________________________
Greg Fretwell

Top



ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals