The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by twh
Today at 06:28 AM
On Delay Relay with Auto Reset
by Potseal
Yesterday at 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 15
HotLine1 10
Trumpy 8
Texas_Ranger 8
sparkyinak 7
Who's Online
2 registered (jraef, LongRunner), 188 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 3 1 2 3 >
Topic Options
Rate This Topic
#159454 - 01/25/07 07:36 PM Rate book detail
Jps1006 Offline
Member

Registered: 01/22/04
Posts: 609
Loc: Northern IL
I'm going to start building a rate book. I have looked through alot of the archives here and have some more questions about how some of you guys do it.

What level of detail do you take your line items to?

I see some of you have a $XX.XX price for 1st item and then less for additional.

What kinds of things do you have adders for?

Here's a sample job, how would you assemble a price for it?

Single family ranch with an unfinished basement. Owner wants a 30-amp 240-volt electric dryer and 20-amp 120-volt washer circuit in bedroom closet 40' away on the first floor. FP stablock panel in the basement with room for breakers. EMT required. Dryer needs 4-wire cord.

To what level of detail would you break that job down to?

Top
Business, Office, Estimating, Legal:
#159455 - 01/25/07 08:53 PM Re: Rate book detail
macmikeman Offline
Member

Registered: 07/16/02
Posts: 718
Loc: Honolulu, Hawaii
Jps, since you saw the job, how long will it take you? And what will your materials cost you? Do you know what your breakeven number is? If so you have all the info you need to make a good bid. Remember also that on small jobs, there is less productivity in the day, but I bet you have a full day there.

Top
#159456 - 01/26/07 04:55 AM Re: Rate book detail
Jps1006 Offline
Member

Registered: 01/22/04
Posts: 609
Loc: Northern IL
Yes Mike your right, key work being "make a good bid."

I am talking about building a flat rate book. If I send my installer (tech) out to look at it and start it right away if approved, how would he go about using a flat rate book to do this? How would you who have books break it out into tasks?

[This message has been edited by Jps1006 (edited 01-26-2007).]

Top
#159457 - 01/26/07 05:27 AM Re: Rate book detail
Tiger Offline
Member

Registered: 05/04/05
Posts: 714
Loc: Crystal Lake, IL USA
(4) 3/4" emt w/ (4) 10ga and (2) 12 ga copper
Dryer Outlet
GFCI
single pole breaker
double pole breaker
Appliance Cord
Addition for access (laundry room drywall)
Possible addition for multiple bends or junction boxes in basement

I'd also give a short lecture on the FP and offer a price on a QO upgrade.

Dave

Top
#159458 - 01/26/07 07:11 AM Re: Rate book detail
A-Line Offline
Member

Registered: 07/23/04
Posts: 264
Loc: Utah, USA
 Quote:
Single family ranch with an unfinished basement. Owner wants a 30-amp 240-volt electric dryer and 20-amp 120-volt washer circuit in bedroom closet 40' away on the first floor. FP stablock panel in the basement with room for breakers. EMT required. Dryer needs 4-wire cord.


JBF-1060-0060 Daily Job Fee (For Job Setup, Cleanup & Paperwork)
DCL-3050-0240 Dedicated Circuit: EMT Conduit 30a Limited Access
DCL-2050-0240 Dedicated Circuit: EMT Conduit 20a Limited Access
AHU-1006-0030 Install Dryer Cord 30a

The dedicated circuit tasks include everything. The breaker, conduit, wire, receptacle, etc.

The above task numbers have a code to them.
The last three digits of the first number is the distance. The four digits of the last number is the time in minutes.

Example: DCL-3050-0240
DCL = Dedicated Conduit Limited Access
3050 = Distance Up To 50 Ft.
0240 = 240 Minutes For Task

I have distances that range from 10 Ft. to 200 Ft. 10ft, 25ft, 50ft, 75ft, 100ft, etc.

I also have three catagories for degree of difficulty.

Open Access = All framing is exposed

Limited Access = Attic space, crawl space or unfinished basement. Fished up or down a finshed wall.

No Access = Wiring has to be fished through finshed walls & ceilings.




[This message has been edited by A-Line (edited 01-26-2007).]

Top
#159459 - 01/26/07 12:11 PM Re: Rate book detail
Jps1006 Offline
Member

Registered: 01/22/04
Posts: 609
Loc: Northern IL
Thanks guys.

A-Line,
Did you buy or make that book?

Do you have a way to account for fluctuating material prices (i.e. automatically tie into purchasing etc.)?

What if I decide I can put (3) #10 & (2) #12 in a 1/2” EMT?

How do you account for the drastic price difference between a GE 2-pole 30 and a Stab Lock?

Top
#159460 - 01/26/07 01:34 PM Re: Rate book detail
LK Offline

Member

Registered: 01/21/03
Posts: 1721
Loc: New Jersey
We use a service software program, cost was about about $145 and it does the work of the $3000 plus programs and has a lot of extras included, no buying add on modules. They have a trial at www.ayanova.com

We make the book from our actuals, and have up to date inventory from our vendor billing.

"Do you have a way to account for fluctuating material prices (i.e. automatically tie into purchasing etc.)?"

Automatic updating is very expensive, but our purchasing prices can be updated with vendor billing, vendor quotes, or connect to the many on line pricing schedules.

"What if I decide I can put (3) #10 & (2) #12 in a 1/2” EMT?"

In that case you use the task add on for that task.

"How do you account for the drastic price difference between a GE 2-pole 30 and a Stab Lock?"

Use the inventory item that fits the job, and add it to the task.

Top
#159461 - 01/26/07 07:42 PM Re: Rate book detail
ITO Offline
Member

Registered: 11/26/06
Posts: 341
Loc: Texas
Why make it complicate?

$150 Material
4 Hours labor
.5 hours overhead
Add your mark-up

[This message has been edited by ITO (edited 01-26-2007).]
_________________________
101° Rx = + /_\

Top
#159462 - 01/26/07 09:02 PM Re: Rate book detail
Tiger Offline
Member

Registered: 05/04/05
Posts: 714
Loc: Crystal Lake, IL USA
A good point ITO, but it takes experience to estimate that way, and often the markup is left out.

Dave

Top
#159463 - 01/27/07 03:13 AM Re: Rate book detail
Dnkldorf Offline
Member

Registered: 12/12/04
Posts: 1091
Loc: nowhere usa
 Quote:
Why make it complicate?


There is a need to complicate things for various reasons. One being that some feel a need to prove how smart they are.

Another reason might be to blow smoke.

Keeping things simple is the best advise I've ever heard.

Top
Page 1 of 3 1 2 3 >



ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals