The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
Texas_Ranger 8
Trumpy 8
sparkyinak 7
Who's Online
0 registered (), 81 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#157726 - 12/29/05 04:17 PM remodel cost
codewarrior Offline
Member

Registered: 12/26/05
Posts: 17
Loc: Camden,New Jersey
Hi guy`s I was wandering, percentage wise the difference between new construction and remodel work.How much higher do you guy`s usually charge,2,3 times ect...?
Example: a 20 amp seperate circuit to micro wave in new construction, versus one after sheetrock and cabinets are up.All things being equal. Take care and be safe.

Top
Business, Office, Estimating, Legal:
#157727 - 12/30/05 08:08 AM Re: remodel cost
macmikeman Offline
Member

Registered: 07/16/02
Posts: 718
Loc: Honolulu, Hawaii
LK's answer is the very best answer, but I know you are looking for a faster way to deal with the question, so I will give you a good swag. If it is just the microwave outlet you are driving over to run, just think for a minute of how much you would charge for this as a service call flat rate and divide that figure by your usual opening charge to get your answer. My guess would be 6 times the usual opening rate. If it is a complete kitchen remodel job with all sheetrock removed that number can come down to three times your normal conditions opening rate, and you will make out allright. Do not drop below three times the normal charge for an opening in remodel work. It is tedious work and you should be able to increase your profit margin on this type of work for the pain and suffering it will cause you.

Top
#157728 - 12/31/05 05:15 AM Re: remodel cost
codewarrior Offline
Member

Registered: 12/26/05
Posts: 17
Loc: Camden,New Jersey
Thanks for both replies,And have a happy new year.

[This message has been edited by codewarrior (edited 12-31-2005).]

Top



ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals