The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by bigpapa
Yesterday at 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 15
HotLine1 10
Trumpy 8
Texas_Ranger 8
sparkyinak 7
Who's Online
0 registered (), 203 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 2 1 2 >
Topic Options
Rate This Topic
#1575 - 05/16/01 08:05 PM MADE ME SHAKE MY HEAD
doc Offline
Member

Registered: 11/25/00
Posts: 119
Loc: Texas
am working as a maint worker for large company someone else has the headaches now.
They have hired a journeyman elec. so he tells me how to do wiring,and now i just shake my head at some of the things these guys are doing at least now my fat is not on the burner,but it makes me shake my head when he and the boss had me run 6 hot wires and 6 grounded conductors in conduit and then at each j-box they had me cut them into and wire nutted them back together Is that legal guess it is ? Is it neat and safe and in a workman like manner guess it is ? I do not think so ,Does it make a bit of since to cut a perfectly fine wire into and wire nut it back together at every 50 ft. which then made a total of 5 splices in it ? or tell, me that raised outlet cover plates do not have to have a ground wire.
THESE are most likely the same type of people that are running neutrals out of different panels,but yet I am the stupid one ha ha
_________________________
MAY THE SUN SHINE ON YOUR FACE IN THE MORNING AND YOU AWAKE WITH A SMILE

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#1576 - 05/16/01 09:06 PM Re: MADE ME SHAKE MY HEAD
CanadianSparky Offline
Member

Registered: 03/05/01
Posts: 86
Loc: Alberta Canada
Only thing I can see is it makes it easier to cut into the circuit at a later date. Guess you could've just left loops though too.

Top
#1577 - 05/16/01 11:18 PM Re: MADE ME SHAKE MY HEAD
Bill Addiss Offline
Member

Registered: 10/07/00
Posts: 4196
Loc: NY, USA
I'm with you CanadianSparky.
I would have left loops.


Bill

Top
#1578 - 05/17/01 03:51 AM Re: MADE ME SHAKE MY HEAD
Redsy Offline
Member

Registered: 03/28/01
Posts: 2138
Loc: Bucks County PA
Each wire now becomes 2 as far as box fill goes. It seems better to leave a loop just in case you needed to tap into it at at later date. This way you may have spare box volume if needed for new wires.

Top
#1579 - 05/17/01 04:53 AM Re: MADE ME SHAKE MY HEAD
electure Offline

Member

Registered: 12/24/00
Posts: 4226
Loc: Fullerton, CA USA
I hope you've got big boxes and small wires!! You've already got 24 wires in each box. The service loops are the way to go, but even at that, they're pushing it here. (ie., 12-#12 in 4Sdeep would only leave room for 1 more conductor...maybe a ground?)

Top
#1580 - 05/17/01 03:59 PM Re: MADE ME SHAKE MY HEAD
gpowellpec Offline
Member

Registered: 12/06/00
Posts: 128
Loc: Irving, Tx USA
When you guys say loop do you mean a 360 degree loop? I try not to have a full loop in spare conductor because that creates a 1 turn inductor. Could create some choking effect to slow down an overcurrent device in event of short circuit. The loop will also try to increase its diameter if large currents run through it. That may cause violent motion that could damage its insulation, pull loose a connection, or damage something else.

Top
#1581 - 05/17/01 08:20 PM Re: MADE ME SHAKE MY HEAD
sparky66wv Offline
Member

Registered: 11/17/00
Posts: 2339
Loc: West Virginia
I've heard that leaving a long extension cord in a coil (on a spool or loose) can drop the voltage more (and burn up your new drill!) than if it were stretched out straight, do to the same effect...

Is this right? I tried to measure the difference once but couldn't determine anything positively...

Would having both poles in the coil (cable) reduce this effect?

[This message has been edited by sparky66wv (edited 05-17-2001).]
_________________________
-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI

Top
#1582 - 05/17/01 08:33 PM Re: MADE ME SHAKE MY HEAD
Anonymous
Unregistered


I was thinking they meant loop like a drip loop, not a circle, just enough slack to cut and splice it later.

Yes, a circle would not be good in a single conductor.

Top
#1583 - 05/17/01 09:58 PM Re: MADE ME SHAKE MY HEAD
CanadianSparky Offline
Member

Registered: 03/05/01
Posts: 86
Loc: Alberta Canada
Im sorry to ask, but I am Canadian and all. Whats a raised outlet cover plate? I'm thinking its a "mud ring for a 4x4 box." And if thats what it is I've never grounded one and would like to know why I have to. Thanks, just wondering.

Top
#1584 - 05/18/01 04:13 AM Re: MADE ME SHAKE MY HEAD
electure Offline

Member

Registered: 12/24/00
Posts: 4226
Loc: Fullerton, CA USA
C Sparky,
These are also referred to as "industrial covers". They are the raised cover that a device (recp in this case) screws to the backside of. Used for surface work. They're not approved for grounding path. In the case of duplex recps, they should have holes and screws for the device to be mounted by the yoke,and not just the screw meant to hold on a cover plate.
By loop, I believe we all meant a piece of wire long enough to be cut and spliced into later, not a little "coil" in the box.

Top
Page 1 of 2 1 2 >



ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals