The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Safety at heights?
by Trumpy
Today at 05:25 AM
Old Bath Fan
by gfretwell
Today at 01:38 AM
Search Function
by Webmaster
Yesterday at 11:13 PM
Forum Software Upgrade coming soon...
by Webmaster
Yesterday at 09:17 PM
ESA Arc flash course
by frank
Yesterday at 04:25 PM
New in the Gallery:
Desk-mounted "power-board"
Top Posters (30 Days)
Webmaster 30
HotLine1 21
Ruben Rocha 16
gfretwell 13
Trumpy 13
Who's Online
1 registered (electure), 0 Guests and 181 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#155878 - 02/20/05 09:12 PM Estimating...Assemblies
Dave55 Offline
Member

Registered: 05/08/04
Posts: 666
Loc: Crystal Lake, Illinois, USA
New thread for...what assemblies would be good for estimating. Some I have are...

10'EMT with 12 ga wire (varying quantities of wire) with connectors.
Recessed light with whip.
Exterior service assembly.
Interior and exterior grounding.
Smoke alarms with whip.
MD dual flood with whip.

Any suggestions for others???

Dave

Top
Business, Office, Estimating, Legal:
#155879 - 02/21/05 04:00 AM Re: Estimating...Assemblies
A-Line Offline
Member

Registered: 07/23/04
Posts: 264
Loc: Utah, USA
I have assemblies in my estimating software for all the symbols on a print for residential.
Some switch examples are:
S
S,S
S,S3
S,S3,S3

Receptacle examples:
120v 15a duplex recpt. indoor
120v 15a decora recpt. indoor
120v 15a GFCI recpt indoor
120v 15a GFCI recpt outdoor

When I do a takeoff on a house I count the symbol and enter the number into my software.
The symbol includes the box, wire, switch, wirenuts, staples, Labor etc. So if there are 5 symbols on the print of S,S3 I select the S,S3 assembly and enter a count of 5.
The software lists all the materials and labor for the five S,S3 taken off.
I can do a takeoff very quickly just by counting each symbol on the print and entering in the quantity.
I have everything to wire a house made into assemblies. Service, Loadcenter, Bath fans,
Smoke detectors, appliances etc.
The software came with a lot of commercial assemblies already set up in it.
I created the residential assemblies myself to match the symbols on the print. The software is set up so that it will break out the rough in from the trim out when I do the takeoff so I will have a time & material list for each.


[This message has been edited by A-Line (edited 02-21-2005).]

Top


ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals