The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
Texas_Ranger 8
sparkyinak 7
Trumpy 6
Who's Online
0 registered (), 235 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#150752 - 09/23/05 07:25 AM Disconnect Safety
dlhoule Offline
Member

Registered: 04/28/05
Posts: 71
Loc: Saline, MI 48197
The JIC, which is no longer in existence, had a standard EGP-1-1967 which stated the panel door had to be closed and latched before turning on disconnect. Does anyone have any idea where I can get a copy of said standard? Any history on why this is no longer a standard? If the NFPA and OSHA require electricians to wear protective gear to open said panels because of Arc Flash concerns, why would they want to be able to turn the disconnect on without the door being latched.

Top
Arc Flash PPE Clothing, LOTO & Insulated Tools
#150753 - 09/23/05 08:22 AM Re: Disconnect Safety
Joe Tedesco Offline
Member

Registered: 10/07/00
Posts: 3325
Loc: Boston, Massachusetts USA
See NFPA 79 and try to make contact with one of the committee members like John Bloodgood, he will have that information. Have you searched the internet?
_________________________
Joe Tedesco, NEC Consultant

Top
#150754 - 09/23/05 11:09 AM Re: Disconnect Safety
dlhoule Offline
Member

Registered: 04/28/05
Posts: 71
Loc: Saline, MI 48197
Thanks Joe,
Yes i have looked in some places on the web.
Can you tell me how to get in touch with Mr. Bloodgood? I have found a number of references to him and his expertise but no way of contacting him. Based on what I have found so far, it looks like sometime after 1985 this requirement was dropped. Probably because of foreign manufacturers, though, I have still seen most of new machines come in meeting that standard.