The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by twh
Today at 06:28 AM
On Delay Relay with Auto Reset
by Potseal
Yesterday at 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 15
HotLine1 10
Trumpy 8
Texas_Ranger 8
sparkyinak 7
Who's Online
0 registered (), 192 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 2 1 2 >
Topic Options
Rate This Topic
#148830 - 05/01/03 11:57 PM Pulling Meters?
Trumpy Offline

Member

Registered: 07/05/02
Posts: 8540
Loc: SI,New Zealand
Regarding Mark's(marktlm123) comments about PoCo employees recieving shocks when removing meters to isolate installations.
Is this a recognised practice(removing the meter)?.
I would have thought that there would be a fuse or some other device, on the Line- side of the meter, to do this(isolate the installation) in a safer way?.


[This message has been edited by Trumpy (edited 05-02-2003).]
_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
Arc Flash PPE Clothing, LOTO & Insulated Tools
#148831 - 05/02/03 03:33 AM Re: Pulling Meters?
pauluk Offline
Member

Registered: 08/11/01
Posts: 7693
Loc: Norfolk, England
There's always a main fuse ahead of the meter in the U.K., but then our meters aren't the plug-in type.

Top
#148832 - 05/02/03 12:04 PM Re: Pulling Meters?
Bjarney Offline
Moderator

Registered: 04/10/02
Posts: 2561
Loc: West-Southern Inner-Northeast ...
Trumpy and Paul — In the US, the norm is called "hot-sequence metering" and has some limitations.

Found at themeterguy web site...




[This message has been edited by Bjarney (edited 05-25-2003).]

Top
#148833 - 05/02/03 12:14 PM Re: Pulling Meters?
Bill Addiss Offline
Member

Registered: 10/07/00
Posts: 4196
Loc: NY, USA
Several years ago the Utility (POCO) on Long Island changed the Meter Pan requirements to include a Manual Bypass Lever in all new installations including Residential. This allows the meter to be pulled or inserted after the switch is closed without any arcing.

Bill

Top
#148834 - 05/02/03 12:20 PM Re: Pulling Meters?
Trumpy Offline

Member

Registered: 07/05/02
Posts: 8540
Loc: SI,New Zealand
Bjarney,
Thanks for the pic, mate.
You were saying that this system has it's limitations, what are these?.
_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
#148835 - 05/02/03 04:34 PM Re: Pulling Meters?
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
Some OH drops are less intimidating , and easier to deal with than older cruted up meters.

Top
#148836 - 05/02/03 04:48 PM Re: Pulling Meters?
iwire Offline
Moderator

Registered: 01/05/03
Posts: 4343
Loc: North Attleboro, MA USA
Trumpy, I think the limitations Bjarney is speaking of are those that show in the picture.

Bad things can happen pulling and replacing meters Hot.

As sparky said some times better to cut off the overhead but at some point you will be reconnecting Hot which brings its own problems.

We are finding more utilities going with "cold" sequence(Main ahead of CTs) metering for services above 400 amps.

Oh, if you have not seen the back side of an undamged meter I guess the picture is not much help. The meter shown has a lot of metal missing.

Hopefully the missing metal was not blasted on to any persons.

[This message has been edited by iwire (edited 05-02-2003).]
_________________________
Bob Badger
Construction & Maintenance Electrician
Massachusetts

Top
#148837 - 05/02/03 06:23 PM Re: Pulling Meters?
Bjarney Offline
Moderator

Registered: 04/10/02
Posts: 2561
Loc: West-Southern Inner-Northeast ...
iwire, that's a good comment. The left blades in the meter photo represent the load-side three phases, plus the neutral tap on one of the middle stabs—at the lower side of the meter socket when operating. The three melted "nubs" at the right side of the picture were once ‘full-sized’ more like the 8-o’clock blade, and normally connected to the ungrounded line-side phases.

Not having the right PPE—it may have been hard to leave such an incident without copper-plated knuckles and eyebrows {and less-than-tidy underwear.}




[This message has been edited by Bjarney (edited 05-02-2003).]

Top
#148838 - 05/02/03 07:19 PM Re: Pulling Meters?
ga.sparky56 Offline
Member

Registered: 11/24/02
Posts: 582
Loc: young harris georgia usa
How many here will fess up to doing a residential panel change,entrance cable and all,by simply removing the meter, leaving the line side of the meter base hot?

I don't do it any more,but I'm betting others have done it also.

Top
#148839 - 05/02/03 09:19 PM Re: Pulling Meters?
marktlm123 Offline
Junior Member

Registered: 04/30/03
Posts: 8
Loc: Oakland, NJ USA
With these meters it's commom for about 5 houses to be on one bucket(tansformer), so if your pulling a meter thats old or has problems you have about 1000 amps plus at 240 behind that and thatb wil hurt you. I think from know on i'll the power company remove the meter, it's there there equipment and they usaly lock it out so let them deal with it.
_________________________
Mark

Top
Page 1 of 2 1 2 >



ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals