#140900 - 05/18/04 05:21 AM How (not?) to get site power...
Texas_Ranger Offline
Member
Registered: 12/17/01
Posts: 2351
Loc: Vienna, Austria
The construction safety discussion reminded me of the ingenious way workers get temp power here. Older apartment buildings usually have a box of Diazed main fuses on each floor, in most cases 20 or 25A. Now if people do any work in the stairway, basement, attic, outside,... they usually don't bother looking for a receptacle. They just open the main fuse box and...



I guess Edison base threads aren't that tight you can't squeeze a 1.5mm2 stranded wire between fuse and fuse holder threads... ground? Why? It works well without!
Did I already mention those fuses are always _ahead_ of the meters? Oooops...
Top
Test Equipment:
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
#140901 - 05/18/04 11:02 AM Re: How (not?) to get site power...
Trumpy Offline


Member
Registered: 07/05/02
Posts: 8560
Loc: SI,New Zealand
Ragnar,
That has to be the simplest Temporary I've seen in a while.
I once saw an Electrician cut the plug off of his extension cord, strip back the wires, attach the Earth and Neutral wires to the appropriate bars in the switchboard.
The seal was then broken and the phase wire shoved into the Line terminal of the Main meter.
He got some free power, until an Inspector dropped by to see what sort of metering equipment was needed for the building upgrade we were doing.
Oops!.
_________________________
Let's face it, these days if you're not young, you're old - Red Green grin
Top
#140902 - 05/18/04 12:32 PM Re: How (not?) to get site power...
Texas_Ranger Offline
Member
Registered: 12/17/01
Posts: 2351
Loc: Vienna, Austria
Sounds like a great idea! The marble guys who redid our main hallway thought they were even more ingenious. They had a short piece of 3x1.5mm2 cord with a Schuko trailing socket and 3 alligator clips. They simply clipped to the respective buses, hooking up their wires just protected by a 60A fuse... the old and simple style is at least 25A max.
Top

Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box

Recent Posts
Looking for older post
by sparkyinak
Today at 12:27 AM
License exam
by TRUE POWER
Yesterday at 11:33 PM
Members: Non-Members: Did you know?
by Admin
Yesterday at 02:34 PM
Safety at heights?
by HotLine1
01/21/17 08:51 PM
International Wire Colour Codes
by Texas_Ranger
01/21/17 03:29 PM

Who's Online
0 registered (), 76 Guests and 8 Spiders online.
Key: Admin, Global Mod, Mod
New in the Gallery:
Desk-mounted "power-board"
Top Posters
gfretwell 9066
Trumpy 8560
pauluk 7693
HotLine1 6833
sparky 5545
Member Spotlight
Tom
Tom
Member Since: 01/01/01
Posts: 1069

ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals