ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 19
Recent Posts
fuse rejectors
by NORCAL. 03/29/17 01:44 AM
Old decora style outlets
by NORCAL. 03/29/17 01:41 AM
NFPA stuff
by gfretwell. 03/28/17 08:08 PM
Anyone hiring inspectors?
by HotLine1. 03/27/17 08:03 AM
ESA Arc flash course
by TheShockDoctors. 03/24/17 10:15 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,894 Are you busy
166,769 Re: Forum
160,885 Need opinion
Who's Online Now
0 registered members (), 98 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#140900 - 05/18/04 08:21 AM How (not?) to get site power...  
Texas_Ranger  Offline
Member
Joined: Dec 2001
Posts: 2,392
Vienna, Austria
The construction safety discussion reminded me of the ingenious way workers get temp power here. Older apartment buildings usually have a box of Diazed main fuses on each floor, in most cases 20 or 25A. Now if people do any work in the stairway, basement, attic, outside,... they usually don't bother looking for a receptacle. They just open the main fuse box and...

[Linked Image]

I guess Edison base threads aren't that tight you can't squeeze a 1.5mm2 stranded wire between fuse and fuse holder threads... ground? Why? It works well without!
Did I already mention those fuses are always _ahead_ of the meters? Oooops...


Test Equipment:
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement

#140901 - 05/18/04 02:02 PM Re: How (not?) to get site power...  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,211
SI,New Zealand
Ragnar,
That has to be the simplest Temporary I've seen in a while. [Linked Image]
I once saw an Electrician cut the plug off of his extension cord, strip back the wires, attach the Earth and Neutral wires to the appropriate bars in the switchboard.
The seal was then broken and the phase wire shoved into the Line terminal of the Main meter. [Linked Image]
He got some free power, until an Inspector dropped by to see what sort of metering equipment was needed for the building upgrade we were doing.
Oops!. [Linked Image]


Let's face it, these days if you're not young, you're old - Red Green grin

#140902 - 05/18/04 03:32 PM Re: How (not?) to get site power...  
Texas_Ranger  Offline
Member
Joined: Dec 2001
Posts: 2,392
Vienna, Austria
Sounds like a great idea! The marble guys who redid our main hallway thought they were even more ingenious. They had a short piece of 3x1.5mm2 cord with a Schuko trailing socket and 3 alligator clips. They simply clipped to the respective buses, hooking up their wires just protected by a 60A fuse... the old and simple style is at least 25A max.



Member Spotlight
dougwells
dougwells
kamloops BC Canada
Posts: 1,137
Joined: May 2003
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.010s Queries: 14 (0.002s) Memory: 0.7504 MB (Peak: 0.8757 MB) Zlib enabled. Server Time: 2017-03-30 20:32:22 UTC