The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by sparkyinak
Yesterday at 03:17 PM
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
sparkyinak 8
Texas_Ranger 8
Trumpy 6
Who's Online
0 registered (), 226 Guests and 5 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 2 1 2 >
Topic Options
Rate This Topic
#137626 - 07/17/03 10:56 AM Just Finished
Belgian Offline
Member

Registered: 10/10/02
Posts: 177
Loc: antwerp
I just finished a whole appartment. I wanted to let you see the plans. A small note: We put all the conduits in the brich walls.









These plans are required by the code.
What are your comments?

Top
Test Equipment:

Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement

#137627 - 07/17/03 11:11 AM Re: Just Finished
Trumpy Offline

Member

Registered: 07/05/02
Posts: 8540
Loc: SI,New Zealand
Ranger,
Is that plan written in Dutch?.
The symbols used in the plans are exactly the same as the ones we use here, there must be an International standard for these.
_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
#137628 - 07/17/03 02:07 PM Re: Just Finished
Bjarney Offline
Moderator

Registered: 04/10/02
Posts: 2561
Loc: West-Southern Inner-Northeast ...
Belgian, those are very handsome drawings. You mention they are required. Do the same codes require updating of drawings when modifications are made?

Top
#137629 - 07/18/03 01:44 AM Re: Just Finished
pauluk Offline
Member

Registered: 08/11/01
Posts: 7693
Loc: Norfolk, England
The symbols are becoming more and more standardized internationally, so you'll probably find them used in many countries now (North America excepted).

Belgian,
Is this a typical layout for a modern house? It seems to have a lot of wasted space in hallways.

Top
#137630 - 07/18/03 07:57 AM Re: Just Finished
Belgian Offline
Member

Registered: 10/10/02
Posts: 177
Loc: antwerp
Trumpy,

Yes, they are in Dutch, but in other parts of Belgium it can be written in French too.

Bjarney,

The drawings can also be handwritten.
Yes, the drawings have to be updated if Major changes are done.

Paul,

Yes, it is considered as a typical, well distributed modern appartment. About the wasted space, well, this is a expensive place and it is important for those people to have a nice, big hall when you come in. The whole appartment is about 150 m2. So the bedrooms and the salon is already big.

Top
#137631 - 07/18/03 09:39 AM Re: Just Finished
C-H Offline

Member

Registered: 09/17/02
Posts: 1508
Loc: Stockholm, Sweden
I haven't seen any recent Swedish drawings, but the old ones had no 'Huischema'. Instead the circuits were drawn onto the 'Huisplan'. Just the path of the cable/conduit, nothing about the use for the circuit. You have to look at the list next to the fusebox for that.

I count 20 circuits. That is a lot in a flat, but then, this is some flat. Are there two ovens (!) or one oven and one cooktop? BTW, why are those circuits on 4mm2?

The drawings are easy to understand.

I wish I had a drawing like that for my parents house. Two 27 way consumer units. Both full. Many unmarked circuits. No drawing. I can't even find the switch to turn on the porch light.

Top
#137632 - 07/18/03 06:35 PM Re: Just Finished
Trumpy Offline

Member

Registered: 07/05/02
Posts: 8540
Loc: SI,New Zealand
Belgian,
Sorry about the mix-up.
I reckon we need these sorts of diagrams to come with any new house or major alteration, over here.
Would make life a LOT easier down the track, when something goes wrong!.
_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
#137633 - 07/19/03 02:54 PM Re: Just Finished
Belgian Offline
Member

Registered: 10/10/02
Posts: 177
Loc: antwerp
C-H,

Yes, 20 circuits is a lot even for such a flat. But as you have noted there are 2 ovens. 1 is a steam oven. And there are 2 central Airconditions. Only Both airco's use alredy 15kW! The electric box which I used for this installation is completely recessed in the wall and it's about 85cm high and 37cm wide! That is some box! I had to install for The 2 airco's a digital clock with 2 channels (and 2 contactors) which can tell each airco to go on at different times. 1 Airco is for the front of the appartment and the 2nd is for the back. The reason why the ovens are on 4mm2 is because the client wasn't decided yet if he would cook with gas or electricity. So I put already a cable which can be used for a electric ranger. It has to be 4mm2 in a 3 phase installation according to our code. Afterwards the client decided that he would cook with gas, So instead of putting more cables, I just used the cable which was there already, for the ovens.

Yes, it does help a lot for fault finding when you have such a drawing.

[This message has been edited by Belgian (edited 07-19-2003).]

Top
#137634 - 07/20/03 04:22 AM Re: Just Finished
Texas_Ranger Offline
Member

Registered: 12/17/01
Posts: 2343
Loc: Vienna, Austria
Belgian, I'm _not_ electric!
It's "ranges".
I think we have plans for new wiring here in Austria, but I have the dark suspicion the electrician keeps them after the job's finished. So try finding out who was the electrician the previous owners hired 25 years ago...

Top
#137635 - 07/20/03 12:00 PM Re: Just Finished
Belgian Offline
Member

Registered: 10/10/02
Posts: 177
Loc: antwerp
Ragnar, sorry. It's the 2nd time I make that mistake!

Yes, officially here the electrician has to give a copy to the owner, but in practice many electricians don't, so that they will be the only one being called.
I personally always give a copy for the client.