The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by sparkyinak
Today at 03:17 PM
Calling all Non-US members!! (Non-US only)
by aussie240
Yesterday at 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
sparkyinak 8
Texas_Ranger 8
Trumpy 6
Who's Online
0 registered (), 221 Guests and 7 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#127647 - 09/13/01 02:26 PM tying inverters together?
tilesetter Offline
Junior Member

Registered: 09/13/01
Posts: 5
Newbie to the electrical field. Can I tie two 750watt inverters together to get a 1500watt inverter. I guess it would be like pulling a 110/15amp line from one house and a 110/15amp line from another house and splicing them together. Would it just short out or theoretically would I now have a 30 amp 110 line, both houses splitting the load?
Like I said, I'm new.
Shawn

Top
#127648 - 09/13/01 03:19 PM Re: tying inverters together?
Anonymous
Unregistered


>Can I tie two 750watt inverters together to get a 1500watt inverter.
No. Unless they have a external clock input for this purpose.

> I guess it would be like pulling a 120V 15amp line from one house and a 120V15amp line from another house and splicing them together.
Not quite. There's a 1 in 6 chance those lines would be in phase if Mister Murphy was not watching.

>Would it just short out or theoretically would I now have a 30 amp 120 line, both houses splitting the load?
I would be a bad idea because you could not force the load to split evenly.
But given roughly equal lengths of the same size and type of conductor with the phase and polarity the same, it would work as you guess.

The difference is that electrical power from the utilities has it phases coordinated. Two inverters will have a random and varying phase angle between them unless external clocking is used. The out of phase portions will be consumed as a short circuit.