The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 15
HotLine1 10
Trumpy 8
Texas_Ranger 8
sparkyinak 7
Who's Online
1 registered (sparkyinak), 237 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#12732 - 08/14/02 09:10 PM Electrical Plans
sparky66wv Offline
Member

Registered: 11/17/00
Posts: 2339
Loc: West Virginia
At the "big job"...

Joe was told that bids are being accepted for the next cottage, so he asked for some electrical plans, but it seems that they don't have any. It will have a finished basement and be more customized than the last one, so the comparison is apples and oranges...

So, after being floored by the fact that they still don't have plans, Joe suggested that I do the plans for them, for a price.

My immediate concerns:

I'm not an EE, can I legally do it?

What do I charge for such a non-stamped-by-EE plans?

I'm also going to mention that I'd be glad to be hired on as their electrical point man and oversee all the other electrical contractors, but I doubt they'll go for it.

We'll see...

Thanks in advance for your replies!

-Virgil

[This message has been edited by sparky66wv (edited 08-15-2002).]
_________________________
-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#12733 - 08/15/02 02:12 AM Re: Electrical Plans
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
could you have an EE review your plan?

(and ask what thier rates are??)

Top
#12734 - 08/15/02 03:46 AM Re: Electrical Plans
nesparky Offline
Member

Registered: 06/21/01
Posts: 650
Loc: omaha,ne
Check your local/state AHJ and see what if any types of construction require stamped plans.
For example a electrical contractor can stamp his own plans for residential and small comercial work in my home state. But if I go 15 miles across the river into Iowa a registered EE must stamp the plans.
The EE I use to review and stamp plans is not cheap.
_________________________
ed

Top
#12735 - 08/17/02 04:14 AM Re: Electrical Plans
Electricmanscott Offline
Member

Registered: 01/12/02
Posts: 1478
Loc: Holden, MA USA
Is this the same nightmare we've been reading about? Why do you want more involvement here?

Top
#12736 - 08/17/02 07:45 AM Re: Electrical Plans
sparky66wv Offline
Member

Registered: 11/17/00
Posts: 2339
Loc: West Virginia
Same job site, different job...

1) There's reportedly 10 to 15 years worth of work.
2) They're willing to pay decent prices.
3) I'm a glutton for punishment.

Actually, a lot has developed since...

Joe and myself aren't seeing eye to eye, I've developed a nasty cold, *cough* and some really bad family problems have arisen, so my perspective is way different than it was last week.

I'm just about ready to tell 'em all where to go.

_________________________
-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI

Top
#12737 - 08/17/02 09:25 AM Re: Electrical Plans
harold endean Offline
Member

Registered: 02/16/02
Posts: 2248
Loc: Boonton, NJ
Sparky,

Same goes here in NJ. A lic. contractor can design the electrical system for 1 and 2 family dwellings. When I got prints from an architect for a house, in order to bid "apples to apples", I would bid the job just as the print was drawn. However I would also submit a proposal for "Extras" needed to get the job pass inspections. This way the general contractor/homeowner knew right away that I wouldn't be looking for extras at the end of the job. I laid it out right up front.