The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Page 1 of 3 1 2 3 >
Topic Options
Rate This Topic
#124621 - 11/12/06 07:18 AM Pics from Shockme77
Trumpy Offline

Member

Registered: 07/05/02
Posts: 8540
Loc: SI,New Zealand
Photos and info submitted by Shockme77:
 Quote:
I'm just about done trimming-out a house and I thought
I'd share some pics of the work I've done. I've never before sent in pictures for the discussion forum and I understand that I'm opening myself up to criticism, so fire-away!. This single-family dwelling is in Scotch
Plains, New Jersey and hasn't been sold yet. Just
slightly less than 5k SQ', and the asking price is $1.4.














_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
Tools for Electricians:
#124622 - 11/12/06 07:46 AM Re: Pics from Shockme77
Jim M Offline
Member

Registered: 08/10/01
Posts: 453
Loc: Chestertown, MD, USA
Doesn't look like the builder cared enough to option out the place with a structured wiring system cabinet. Also doesn't look like enough branch circuits.

I think I would have used some of the KO's in the TJIs to run my home runs through.

Top
#124623 - 11/12/06 08:00 AM Re: Pics from Shockme77
SteveFehr Offline
Member

Registered: 03/19/05
Posts: 1192
Loc: Chesapeake, VA
Your AHJ lets you bundle that many Romex together for long runs without derating?

Top
#124624 - 11/12/06 09:33 AM Re: Pics from Shockme77
Alan Nadon Offline
Member

Registered: 03/10/05
Posts: 398
Loc: Elkhart, IN. USA
Violation.
Check Section 334.15(C)
Otherwise it would pass inspection.
Alan--
One solution would be to drop the wires, install 1X2 or other running boards, and put the wires back up. You should check with the manufacturer of the T joist since they do not like to have things nailed or screwed to the bottom edge.
A--

[This message has been edited by Alan Nadon (edited 11-12-2006).]

[This message has been edited by Alan Nadon (edited 11-12-2006).]
_________________________
Alan--
If it was easy, anyone could do it.

Top
#124625 - 11/12/06 09:44 AM Re: Pics from Shockme77
renosteinke Offline
Cat Servant
Member

Registered: 01/22/05
Posts: 5305
Loc: Blue Collar Country
It's only a bundle if you fail to "maintain spacing." The plastic trees he used to support the romex do maintain spacing between the wires. Indeed, it looks like he exceeded code requirements for support.

Since he's using proper hangers, I'm not sure what the use of running boards would accomplish; there does not appear to be any significant 'droop' to the cables. Perhaps this will need to be addressed in the next code cycle?

The KO's in the joists NEVE line up. Nor would using them for support -in lieu of runing boards- support the cables any better than they already are supported.

Awfully nice that the gutter crew saw fit to go around the service drop; usuallym they try to pry it out from the wall!


The only 'nit' I see to pick at is the lack of working space in front of one of the air conditioner disconnects.

Top
#124626 - 11/12/06 12:57 PM Re: Pics from Shockme77
LarryC Offline
Member

Registered: 07/05/04
Posts: 776
Loc: Winchester, NH, US
Where is the outlet for the air conditioning condensors?

Do you have a ground rod under the meter?

Does the central steel beam need to be bonded?

Larry C

Top
#124627 - 11/12/06 01:07 PM Re: Pics from Shockme77
iwire Offline
Moderator

Registered: 01/05/03
Posts: 4343
Loc: North Attleboro, MA USA
No bundling derating issue to even consider if there are less than 9 current carrying conductors in either of those bundles if indeed the AHJ feels they are bundles.

(Mine would)
_________________________
Bob Badger
Construction & Maintenance Electrician
Massachusetts

Top
#124628 - 11/12/06 02:15 PM Re: Pics from Shockme77
ShockMe77 Offline
Member

Registered: 06/11/05
Posts: 823
Loc: Rahway, New Jersey
 Quote:
Also doesn't look like enough branch circuits.


I installed a 125 AMP sub panel in the 2nd floor laundry room. It feeds 5 bedrooms, 1 future bedroom, 2 full baths, master bathroom jacuzzi (20 amp), 2 furnaces, and all 2nd floor and attic lighting. It is full at 20 full size breakers but has the capacity for 40 twins.

 Quote:
One solution would be to drop the wires, install 1X2 or other running boards, and put the wires back up.


That's what I did originally. The boss didn't like it that way and had me change it to how it is now.

 Quote:
Awfully nice that the gutter crew saw fit to go around the service drop; usuallym they try to pry it out from the wall!


Fortuneatly, I got to do the service before the gutters were installed.

 Quote:
Where is the outlet for the air conditioning condensors?
Do you have a ground rod under the meter?

Does the central steel beam need to be bonded?


The 210.63 requirement is within 25' of the equipment but can't be seen in the picture. It's there though.

No ground rod is needed. The Ufer was available and was used. The copper water pipes are bonded by #4 cu and the water heater is jumped out from hot to cold.

 Quote:
No bundling derating issue to even consider if there are less than 9 current carrying conductors in either of those bundles if indeed the AHJ feels they are bundles.


The AHJ had no issues with bundling. He asked me a question about article 250.148 during the rough inspection and was impressed that I knew what he was talking about.

Not sure when the final inspection will be though.

Top
#124629 - 11/13/06 08:13 AM Re: Pics from Shockme77
Alan Nadon Offline
Member

Registered: 03/10/05
Posts: 398
Loc: Elkhart, IN. USA
Shock, and all,
NEC 334.15(C) In Unfinished Basements. Where cable is run at angles with joist in ubfinished basements , ...2 #6 or 3 #8 directly to lower edge....
Smaller cables SHALL be run either through bored holes in joist or on running boards.
Below the joist NM cable is a violation.
It isn't just support but, protection. People used to use the wires as clothes line and hang wet clothes from wire hangers from the conductors. A real treat when they had K&T wiring.
Alan--
_________________________
Alan--
If it was easy, anyone could do it.

Top
#124630 - 11/13/06 01:38 PM Re: Pics from Shockme77
ShockMe77 Offline
Member

Registered: 06/11/05
Posts: 823
Loc: Rahway, New Jersey
Alan, I interpret article 334.15(C) the same way you do. In fact, that is how I originally installed the cables, on a running board until I was told by the builder AND my boss to do it the way you see it is now. Most inspectors around here are ok with this install as long as it can be boxed-out later if a sheetrock ceiling is installed instead of a suspended ceiling.