The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by sparkyinak
Yesterday at 03:17 PM
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
sparkyinak 8
Texas_Ranger 8
Potseal 6
Who's Online
0 registered (), 216 Guests and 5 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#11958 - 07/27/02 09:46 AM Permits
sparky*62 Offline
Member

Registered: 07/27/02
Posts: 20
Loc: Ca.
When is it nessecary to obtain a permit and who would you ask ?I have done jobs were each trade would have to have a permit.And jobs were one permit covered all aspects. I am doing a remodel were the owner hired a handyman (nonlicensed)as the prime builder and they have no permit.

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#11959 - 07/27/02 09:54 AM Re: Permits
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
perhaps an inquiry here???


 Quote:
California


--------------------------------------------------------------------------------

Department of Consumer Affairs
Contractors State Licensing Board
P.O. Box 26000
Sacramento, CA 95826 (916) 255-3900
Fax: (916) 366-9130

Top
#11960 - 07/27/02 09:28 PM Re: Permits
jo Offline
Member

Registered: 04/20/02
Posts: 22
Loc: Oakland, California
In California it is a misdemeanor to engage in the business or act in the capacity of a contractor without a contractor's license

Top
#11961 - 07/28/02 03:40 AM Re: Permits
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
jo,
does the 'misdemeanor' justify the contract?

Top
#11962 - 07/28/02 09:04 AM Re: Permits
George Offline
Member

Registered: 02/23/02
Posts: 380
In driving thru Michigan I have seen signs: Zoned Comumity Permits Required.

In general, you can get permit information from the local goverment offices.

If the question is more like: How much work can I do before I neeed a permit? (Do I need a permit to replace a recept?)

This is a legal matter. If the electrictian and AHJ are on conflicting sides, a court needs to decide.

Top
#11963 - 07/28/02 10:07 AM Re: Permits
sparky*62 Offline
Member

Registered: 07/27/02
Posts: 20
Loc: Ca.
Yes. The question is : How much work can I do without a permit?

Top
#11964 - 07/28/02 11:57 AM Re: Permits
arseegee Offline
Member

Registered: 01/28/02
Posts: 321
Loc: Statesboro, GA USA
62, my immediate AHJ limits the job to $1000.00 before you have to pull a permit. Check with you inspectors office because it varies from place to place.

Top
#11965 - 07/28/02 04:59 PM Re: Permits
harold endean Offline
Member

Registered: 02/16/02
Posts: 2248
Loc: Boonton, NJ
In NJ you are allowed to change up to 5 devices (receptacles, switches, light fixture,etc.) before a permit is needed. You can replace ballasts and bulbs all you want. All of this is considered "minor repairs". However, you need a permit to change a receptacle into a GFCI type. The only people in NJ who are allowed to do electrical work are licensed electrical contractors, with business permits or the homeowner who lives in the house that is a one family dwelling and that family is his/hers.

Caper

Top
#11966 - 07/28/02 05:33 PM Re: Permits
George Offline
Member

Registered: 02/23/02
Posts: 380
Sparky*62 ---

Personally, I would like all work to require a permit and inspection or for no work to need either. But neither will ever happen.

I don't see a difference in one electrictian who spends a 5 days doing one house and needs a permit or another electrictian who does the same amount and type of work but spreads it over twenty houses and 10 days and does not need permits for any of the jobs.

Permit work takes at least 2 trips for an electrictian. The first trip to do the work and the second to watch the inspection. You cannot charge reasonable rates for this much effort. (Around here you call for the inspection when the work is done and the inspection takes place SOMETIME the next day.)

Top
#11967 - 07/29/02 11:44 AM Re: Permits
dana1028 Offline
Member

Registered: 01/09/02
Posts: 163
Loc: San Carlos, CA
Sparky - you are in CA - CA Contractos State License Board is at www.cslb.ca.gov - this site has EVERYTHING you need to know about CA contractor requirements - I'll expand on your question just a little bit. 1. You must be a licensed contractor if you do more than $500 in work (this $500 includes materials/fixtures). 2. If you do work in a residence you MUST also be a certified (through the state contractor board) Home Improvement Contractor (HIC). 3. Almost any work done requires a permit (to answer your original question). Check with the local jurisdiction but technically you need a permit to replace a defective light switch. I just worked on a home that was completely rennovated - new roof, new stucco, new water heater, new kitchen, gas and water lines moved, all new windows/doors throughout, carpet, paint....I was the ONLY licensed contractor on the job! Really pissed me off, but I did tell tell the other tradesmen that if I even found one of their fingerprints on any of my electrical work I'd be calling in the state contractor board.