#119452 - 12/28/04 05:26 PM Raceway not Continuous
Webmaster Offline

Administrator
Member

Registered: 10/07/00
Posts: 3142
Loc: NY, USA
 Quote:
Those data guys strike again!

Here, the hack -customer admits he was not a licensed contractor- apparently did not own a bender. So, who needs to connect the pipes together, anyways? It's only phone & data, right?

- John Steinke

Top
Tools for Electricians:
#119453 - 12/28/04 06:05 PM Re: Raceway not Continuous
Trumpy Offline

Member

Registered: 07/05/02
Posts: 8540
Loc: SI,New Zealand
I see the guy in the picture is smiling, but I don't think it's at the quality of the adjacent workmanship!.
_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
#119454 - 12/28/04 06:30 PM Re: Raceway not Continuous
bp-redbear Offline
Member

Registered: 08/30/04
Posts: 53
Loc: NY
Measure once, cut twice...three times..."Oops, now it's too short..."

Portrait kinda looks like Howard Cosell(sp.?)

Looks like some of the white wires and the black cord go right through the wall.

Man, that's ugly wiring, is this an office, or a storage room?

Top
#119455 - 12/28/04 06:59 PM Re: Raceway not Continuous
John Steinke Offline
Member

Registered: 04/03/01
Posts: 509
Loc: Reno,Nv., USA
Location is office of a restaurant. Office is located in basement, inside former walk-in cooler.
Yes, some wired do exit through the wall.

I had never noticed the smiling picture! I think he's laughing at the work!

Top
#119456 - 12/29/04 03:29 PM Re: Raceway not Continuous
DougW Offline
Member

Registered: 06/08/03
Posts: 1083
Loc: North Chicago, IL
 Quote:
Originally posted by bp-redbear:

Portrait kinda looks like Howard Cosell(sp.?)


I was thinking Rupert Murdoch myself

Top
#119457 - 12/29/04 03:31 PM Re: Raceway not Continuous
dstanford Offline
Member

Registered: 12/29/04
Posts: 19
Loc: Asheville NC USA
i have heard some data comm people call that a "air gap" and have seen them do it with 4" backbone runs in hospitals

Top
#119458 - 01/02/05 05:12 AM Re: Raceway not Continuous
iwire Offline
Moderator

Registered: 01/05/03
Posts: 4343
Loc: North Attleboro, MA USA
Kind of interesting, aside from ones own pride in workmanship do other trades have to install EMT to NEC standards if they choose to use it?

We work for a customer that sells flowers, a contractor for them (not electrical) uses 2" EMT to run plastic tubes that carry nutrients to the plants from a central location out to the flower displays.

They by no means install this as the NEC describes.

But does it matter?

They are not bound by the NEC.

As for the 'Air Gaps' left by data cabling guys what is the violation?

Data cables are not required to be in enclosures so a complete raceway system can be just a short section of raceway.

Not saying I like sloppy work, just asking for a violation to cite.

I do not think there is one.

Bob



[This message has been edited by iwire (edited 01-02-2005).]
_________________________
Bob Badger
Construction & Maintenance Electrician
Massachusetts

Top
#119459 - 01/02/05 06:00 AM Re: Raceway not Continuous
Trumpy Offline

Member

Registered: 07/05/02
Posts: 8540
Loc: SI,New Zealand
Good point Iwire,
I see in the same pic a run of cable that looks like RG-6 Coaxial cable, un-protected throughout it's length, it seems to be doing OK.
 Quote:
I was thinking Rupert Murdoch myself

Perhaps that's why Rupe is smiling so wide, his signals are getting through and at a cheaper price, no EMT where he comes from!.
BTW, is it my eyes or does that run of EMT have an upward bow in it, to the left?.

{Message edited to add last question.}

[This message has been edited by Trumpy (edited 01-02-2005).]
_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
#119460 - 01/02/05 06:46 PM Re: Raceway not Continuous
dstanford Offline
Member

Registered: 12/29/04
Posts: 19
Loc: Asheville NC USA
why bother putting any of the cable run in conduit if you leave some unprotected? well first code violation Neat workmanlike manner
our local AHJ would turn the work in that pic down and laugh while doing it.

Top
#119461 - 01/02/05 09:31 PM Re: Raceway not Continuous
sparkystudent Offline
Member

Registered: 04/06/04
Posts: 43
Loc: Staples, MN. USA
i feel that several good points have been made here, 1 is does 2" pvc when used as a "holder" for hydroponics lines need to be installed to code? i would think not what part of that is an electrical installation? so the nec or a permit or even the licensing of the installer is N/A. but ...and theres always a but-usually me - in the picture i would think so (atleast in my area) due to the fact all of article 800 is now required to be inspected, have even seen inspectors go back after really bad installations that were done on the sly in a school, and make them be repaired to code. if something is listed and labeled for an open surface install then it would be ok to do that (workman like manner not withheld) or the use of conduit for protection from damage or to penetrate firewall or something to the like , my wondering is where do you draw the line of workman like manner. it sure wouldnt pass in my book but i have seen much worse work that others have been very proud of, yes proud to the point of bragging. and i cringed and wanted to point out the problems but the only one was workman like manner , and sometiomes that is the most dangerous violation.IMHO ok i will get off my soapbox now