The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by HotLine1
Today at 01:42 PM
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 10
Texas_Ranger 8
sparkyinak 8
Potseal 6
Who's Online
2 registered (Webmaster, LongRunner), 227 Guests and 5 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#11917 - 07/26/02 05:41 PM first modular for me
derater Offline
Member

Registered: 03/30/02
Posts: 182
Builder called today-meeting tomorrow-any insight into these?Thanks.

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#11918 - 07/26/02 06:54 PM Re: first modular for me
Jim M Offline
Member

Registered: 08/10/01
Posts: 453
Loc: Chestertown, MD, USA
The only one I worked on only needed grounding, basement lighting, HVAC and to have the panel set on the wall and the tail extended to the meter. The panel was already cut down and labeled

Top
#11919 - 07/26/02 08:09 PM Re: first modular for me
Bill Addiss Offline
Member

Registered: 10/07/00
Posts: 4196
Loc: NY, USA
The ones I have dealt with also needed splices to be made from one half to another for 3 ways etc in Basement and Attic. If there is a second floor there might be some Homeruns (tails hanging) that need to be run to the panel.

Bill

Top
#11920 - 07/27/02 05:30 PM Re: first modular for me
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
derater;
modulars are not all created equal, however they all fall under the catagory of "I want it fast & cheap", and as such , much workmanship ( as well as apparently lobbied codes) follows suit.
The 'list' you inquire of could well be made from any prints forwarded to you......