ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 16
Recent Posts
fuse rejectors
by gfretwell. 03/23/17 01:12 PM
Another Forum Update
by Admin. 03/22/17 03:04 PM
Dining room plugs
by watersparkfalls. 03/21/17 10:31 PM
TRUE POWER
by jraef. 03/21/17 09:13 PM
WEG CFW-11 Frequency Inverter
by jraef. 03/21/17 08:50 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,275 Are you busy
165,982 Re: Forum
160,497 Need opinion
Who's Online Now
0 registered members (), 54 guests, and 13 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#116573 - 04/12/04 04:58 PM 1000 KVA Transformer.  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
This is a service change that for the most part I did with one helper.

The building had a 4000 amp 208/120 service, we changed that to a 3000 amp 480/277 service.

We also added a 1200 480 volt switchgear almost 400' from the new service.

The original service had two 800 amp 208 volt feeders that fed two 208 to 480 volt transformers to feed some 480 volt refrigeration equipment.

My entire "print" for this job was an 8.5" x 11" paper one line diagram drawn by a VP at my office.

Key points.

1)Install new pad mount transformer outside and run conduit to a POCO substation.

2)Install new 480 volt 3000 amp switchgear

3)Refeed existing 4000 amp 208 service gear with 1000 KVA transformer

4)Run two 300 amp 480 volt feeds for refrigeration equipment.

5)Run 1200 480 volt feeder and install switch gear on the other side of building.

6)Reroute Fire pump feeder off of 4000 amp service gear and to another 208 service in the same area.

7)And as always little to no downtime, we did the cut over with 12 guys that worked 12 to 20 hours one weekend.

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

I wish I had pictures of the pipe work before the service gear arrived, I could not wait and did 99% of the pipe work before the gear was even on site.

Good cut sheets from Square D make that possible and when the gear arrived I punched and tipped it in under the raceways.

Bob



[This message has been edited by iwire (edited 04-12-2004).]


Bob Badger
Construction & Maintenance Electrician
Massachusetts

Tools for Electricians:

#116574 - 04/12/04 05:04 PM Re: 1000 KVA Transformer.  
big guy  Offline
Member
Joined: Dec 2003
Posts: 59
pa
good looking job


#116575 - 04/12/04 05:54 PM Re: 1000 KVA Transformer.  
Electricmanscott  Offline
Member
Joined: Jan 2002
Posts: 1,457
Holden, MA USA
Ok lets rip this one to shreds! Just kidding Bob, looks awesome!


#116576 - 04/12/04 06:56 PM Re: 1000 KVA Transformer.  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,259
Fullerton, CA USA
Looks nice, Bob.
We're doing very much the same thing now.

2000A 208/120 existing.
3000A 480/277 new.

We're just going to refeed the 208 gear with a 500KVA xfrmr, the 120/208 load is not going to be that much.
I'll get some pics. You'll probably laugh when you see the meters on the front of the switchboards...S


#116577 - 04/12/04 09:05 PM Re: 1000 KVA Transformer.  
Nick  Offline
Member
Joined: Aug 2001
Posts: 599
Riverside, CA
Nice Job Bob!
Gotta love that Square D gear.


#116578 - 04/12/04 09:23 PM Re: 1000 KVA Transformer.  
Roger  Offline
Member
Joined: May 2002
Posts: 1,716
N.C.
Very nice work job Bob.

One question though, did you guys carry the gear down those stairs? [Linked Image] [Linked Image]

Roger



[This message has been edited by Roger (edited 04-12-2004).]


#116579 - 04/12/04 09:47 PM Re: 1000 KVA Transformer.  
CTwireman  Offline
Member
Joined: Feb 2002
Posts: 840
Connecticut, USA
Very nice. [Linked Image]

You'll have to excuse my ignorance with this stuff, as I primarily do residential work.

Does that gear come as "some assembly required" or is it allready assembled? That stuff looks seriously heavy!! Square D has always been know for its robust equipment.

What size conductors are those hanging out of the switchboard?

What type of facility is this?

Peter

[This message has been edited by CTwireman (edited 04-12-2004).]


Peter

#116580 - 04/12/04 10:06 PM Re: 1000 KVA Transformer.  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
That gear came as 3 sections, bolt together on site.

Yes it is heavy, those 3 sections together are probably 1100 to 1300 lbs.

The conductors hanging out are 3 sets of 600 kcmil copper to feed the 1200 amp switch gear.

The service conductors are eight sets of 500 kcmils for 3000 amps.

The 1000 KVA transformer inside was a little over 6000 lbs.

No I did not have to bring it down the stairs [Linked Image] I did buy a 30 pack and give it to the contractor installing a large conveyor system (the reason for the 480 volt upgrade) the 30 pack gave me the use of his propane folk lift.

The forklift was tagged at 5500 lb capacity so the 6000+ lb transformer was pushing the limits, keep it low. [Linked Image]

The outside transformer is close to 15,000 lbs and we opted for riggers to set it for us.

At the time this was a Dot Com home food delivery company, they went out of business.

The upstairs Tennant had 12,000 amps @ 480 (3 x 4000 amps) coming in from the roof along with a another 4000 amps @ 208 coming in near my work.

That tenant was all computers, they had enough generators to pick up all that.

[This message has been edited by iwire (edited 04-12-2004).]


Bob Badger
Construction & Maintenance Electrician
Massachusetts

#116581 - 04/12/04 10:28 PM Re: 1000 KVA Transformer.  
Bjarney  Offline
Moderator
Joined: Apr 2002
Posts: 2,527
West-Southern Inner-Northeast ...
iwire—that looks like a mighty beefy drytype transfomer. Can you post the rated temperature rise? [Often 150, 115 or 80°C]

Assumedly it is 480∆ — 208Y?

Also, my congratulations. The stress and details of cutover work during a tightly scheduled outage always drove me nuts.




[This message has been edited by Bjarney (edited 04-12-2004).]


#116582 - 04/12/04 11:10 PM Re: 1000 KVA Transformer.  
Ryan_J  Offline
Moderator
Joined: Aug 2003
Posts: 1,374
West Jordan, Utah, USA
On the second picture from the bottom does the man door have an self-closer on it?


Ryan Jackson,
Salt Lake City

Page 1 of 2 1 2

Member Spotlight
SafetyWired
SafetyWired
Pa, USA
Posts: 44
Joined: July 2013
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.023s Queries: 15 (0.004s) Memory: 0.8187 MB (Peak: 0.9932 MB) Zlib enabled. Server Time: 2017-03-24 02:06:16 UTC