ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 16
Recent Posts
Another Forum Update
by Admin. 03/22/17 03:04 PM
Dining room plugs
by watersparkfalls. 03/21/17 10:31 PM
TRUE POWER
by jraef. 03/21/17 09:13 PM
WEG CFW-11 Frequency Inverter
by jraef. 03/21/17 08:50 PM
fuse rejectors
by HotLine1. 03/20/17 08:14 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,152 Are you busy
165,898 Re: Forum
160,446 Need opinion
Who's Online Now
0 registered members (), 51 guests, and 13 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#112983 - 12/30/01 07:41 PM Save-a-Box  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,434
NY, USA
[Linked Image]
Quote
Somebody really put in a lot of labor to save material on this one.

- Electure (Scott)


Tools for Electricians:

#112984 - 12/31/01 07:30 AM Re: Save-a-Box  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,303
Scott,
personally, i would not do this. However, it does tickle that NEC lobe in my gray matter (not trying to be difficult here, really..) as to comparisson to this....
http://www.gen-tran.com/transfer.htm


#112985 - 12/31/01 02:29 PM Re: Save-a-Box  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,259
Fullerton, CA USA
Steve,
Exactly


#112986 - 01/02/02 12:41 AM Re: Save-a-Box  
Zalman  Offline
Junior Member
Joined: Jan 2002
Posts: 2
Berkeley, CA. USA
If it is clean and safe like this appears, I like it.


Zalman

#112987 - 01/02/02 11:25 AM Re: Save-a-Box  
mamills  Offline
Member
Joined: Nov 2001
Posts: 745
Wharton, Texas, USA
Is there anyone in the group who has done electrical maintenance work in a public assembly facility, such as a convention center? I remember seeing something such as this at a convention I attended some time ago. In the exhibit hall where numerous small booths were set up, there were portable load centers set up in this manner for distributing power from large-capacity floor receptacles (floor pockets) located at various points throughout the room. From these panels, smaller portable cables(I assume 12/3 or 10/3 SO cable or something of the like) carried different "circuits" to booths according to their electric requirements. The whole affair would be laid on the floor in an "alley" created by the booths being set up back to back. Looked like a reasonably safe way of temporarily distributing power. I would guess that the wiring inside the load center could be pretty tight due to the body of the receptacle being in there too.

Does anyone know of an NEC article that forbids (or regulates) this type of work?

Mike (mamills)


#112988 - 01/02/02 01:06 PM Re: Save-a-Box  
Joe Tedesco  Offline
Member
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA
See Section 518-3(b) This section in the 1999 NEC covers "Temporary Wiring" in a Place of Assembly.

[This message has been edited by Joe Tedesco (edited 01-02-2002).]


Joe Tedesco, NEC Consultant

#112989 - 01/03/02 09:30 PM Re: Save-a-Box  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,259
Fullerton, CA USA
I don't think this is a violation per '99 Code, but in '02 - 406.4 "Receptacle Mounting. Receptacles shall be mounted in boxes or assemblies designed for the purpose, and such boxes or assemblies shall be securely fastened in place."
404.3 "Enclosure. (A)" Basically says the same for switches ("listed for the intended use").
This town's still going under '96 Code, so I guess it's OK.
but still, this guy used a die grinder on these holes...T&M maybe??



Member Spotlight
RonKipperDatacom
RonKipperDatacom
Kansas City, KS
Posts: 30
Joined: January 2013
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.013s Queries: 14 (0.003s) Memory: 0.7830 MB (Peak: 0.9360 MB) Zlib enabled. Server Time: 2017-03-23 02:19:32 UTC