#112834 - 10/05/01 08:38 PM Dedicated Working Space
Webmaster Offline


Registered: 10/07/00
Posts: 3142
Loc: NY, USA

Showed up at this house for trim out to find furniture everywhere. Only temp lights and 6 temp GFCI receptacle circuits are connected, all other circuits are waiting, and now I can barely get to the panel. GC didn't meet the deadline, now I'm going to pay for it in aggravation...

The job that never ends... (Same "nightmare house" that I roughed-in in August)


Tools for Electricians:
#112835 - 10/06/01 04:11 AM Re: Dedicated Working Space
sparky Offline

Registered: 10/18/00
Posts: 5545
how about a contractual addendum like..

"stumbling over other trades"


"trim out after occupancy"

#112836 - 10/07/01 05:55 AM Re: Dedicated Working Space
electure Offline


Registered: 12/24/00
Posts: 4226
Loc: Fullerton, CA USA
This is certainly something we don't run into out here on new construction (this wasn't a remodel, was it?).
Until everything is finalled, an owner can't move in a stick of furniture. To do so would incur major inspection dept. wrath.