#110632 - 05/30/06 11:40 AM Rebar Connection
Webmaster Offline

Administrator
Member

Registered: 10/07/00
Posts: 3142
Loc: NY, USA
 Quote:
This one was sent to me from another inspector in the office.

The contractor also supported his rebar by driving pieces of bar into the earth and tying the horizontal pieces to them.

-Alan Nadon

Top
2014 / 2011 NEC & Related Books and Study Guides
#110633 - 05/30/06 06:23 PM Re: Rebar Connection
harold endean Offline
Member

Registered: 02/16/02
Posts: 2248
Loc: Boonton, NJ
Alan,

Is there a UL rebar clamp somewhere on that piece of rebar? Or is that ground wire just tie-wrapped to the rebar?

Top
#110634 - 05/31/06 04:55 AM Re: Rebar Connection
RSmike Offline
Member

Registered: 11/27/02
Posts: 130
Loc: Holland, MI USA
What's that little mess on the right. Looks almost like someone tried to split the strands and wrap them around the rebar. Perhaps an underwriter's knot?

RSlater,
RSmike

Top
#110635 - 05/31/06 10:19 AM Re: Rebar Connection
Alan Nadon Offline
Member

Registered: 03/10/05
Posts: 398
Loc: Elkhart, IN. USA
The mess on the right is from seperating the strands and wrapping them around the rod.
The nylon ties made a better connection although I don't think they are listed as direct burial connectors.
Somedays it just doesn't seem like any progress is ever going to be made.
Alan--
_________________________
Alan--
If it was easy, anyone could do it.

Top
#110636 - 05/31/06 12:37 PM Re: Rebar Connection
Jim M Offline
Member

Registered: 08/10/01
Posts: 453
Loc: Chestertown, MD, USA
While I would not accept that as an acceptable connection to the rebar, I would ask if the rebar was just supporting a 20' length of conductor would there need to be a connection?

Top
#110637 - 05/31/06 06:38 PM Re: Rebar Connection
georgestolz Offline
Member

Registered: 06/26/05
Posts: 90
Loc: Fort Collins, CO, US
 Quote:
While I would not accept that as an acceptable connection to the rebar, I would ask if the rebar was just supporting a 20' length of conductor would there need to be a connection?
I would say no.
_________________________
-George

Top
#110638 - 06/01/06 12:24 AM Re: Rebar Connection
Trumpy Offline

Member

Registered: 07/05/02
Posts: 8540
Loc: SI,New Zealand
Alan,
All that suggests to me is Galvanic Corrosion.
Also them white cable ties will last about a month in the sun.
_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
#110639 - 06/12/06 09:57 PM Re: Rebar Connection
Tesla Offline
Member

Registered: 06/16/04
Posts: 1280
Loc: Sacramento, CA
That sure looks like a 3/0 Ufer tied to the footer rebar.

Such is done all the time out my way.

The assembly to be puddled completely in concrete.

Zip ties or tie wire are used all of the time.

Normally no attempt is even made to get tricky at the end.
_________________________
Tesla

Top
#110640 - 06/22/06 02:08 AM Re: Rebar Connection
e57 Offline
Member

Registered: 05/27/03
Posts: 2837
Loc: S.F.,CA USA
Same here, it is a conveinient way of suspending the GEC / UFER in the bottom in the pour. The guy probhably wrapped it at the end to get it to stay put while he rolled it out. The zip tie wont matter after preservation in the concrete... Any galvanic action is on the steel not the copper, and minimal at best. With current prices of copper you may see less of this type installation. Usually I try to go across the rebar, not along it....

[This message has been edited by e57 (edited 06-22-2006).]
_________________________
Mark Heller
"Well - I oughta....." -Jackie Gleason

Top



ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals