#110158 - 02/20/06 04:37 PM How would you have done this?
Trumpy Offline


Member

Registered: 07/05/02
Posts: 8552
Loc: SI,New Zealand
Pictures and info submitted by harold endean:

 Quote:
Here are a couple of pictures I saw of a mast where the service drop is below the eave of the building. So what do you do? You just cut a hole in the roof/eave and pass the service drop right through it. The siding was aluminum and it looked sharp:










_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
2017 / 2014 NEC & Related Books and Study Guides
#110159 - 02/20/06 08:42 PM Re: How would you have done this?
Lostazhell Offline
Member

Registered: 02/21/04
Posts: 1248
Loc: Bakersfield, CA (Originally Or...
It's amazing that some people just completely don't comprehend what kind of power is in a utility drop!!

Top
#110160 - 02/20/06 08:43 PM Re: How would you have done this?
LoneGunman Offline
Member

Registered: 10/02/05
Posts: 141
Loc: Florida
Conduit shouldve been ran to the end of the building.

Top
#110161 - 02/21/06 04:52 AM Re: How would you have done this?
mahlere Offline
Member

Registered: 11/17/05
Posts: 514
Loc: New Jersey
My guess is that the electric came before the roof and soffit.

But that's just a guess

Top
#110162 - 02/21/06 06:47 AM Re: How would you have done this?
rad74ss Offline
Member

Registered: 04/19/04
Posts: 154
Loc: Pryor, OK USA
At least the rain going down the wires will cool off the areas that have their insulation scraped off by the soffet.

Top
#110163 - 02/21/06 07:20 PM Re: How would you have done this?
georgestolz Offline
Member

Registered: 06/26/05
Posts: 90
Loc: Fort Collins, CO, US
Perhaps I am evil. It's a possibility.

I've run masts through the soffit, albeit high enough for a drip loop, and with cleaner holes.

Did they use a roof jack for the upper hole?

Edit: Oh- I see it. Yeah, the conductors running along the side of the building is bad too!

[This message has been edited by Just George (edited 02-21-2006).]
_________________________
-George

Top
#110164 - 02/22/06 05:04 PM Re: How would you have done this?
harold endean Offline
Member

Registered: 02/16/02
Posts: 2248
Loc: Boonton, NJ
My guess would also be that the mast and service was there first. Then some roofers added the soffet and cut holes for the service drop. Then they wonder what they did wrong when they get shocked and fall off scaffolds. Go Figure!

Top
#110165 - 02/24/06 02:14 AM Re: How would you have done this?
Trumpy Offline


Member

Registered: 07/05/02
Posts: 8552
Loc: SI,New Zealand
I'm with Randy(Lostazhell) here,
 Quote:
It's amazing that some people just completely don't comprehend what kind of power is in a utility drop!!

Iwire (Bob) showed that to us a wee while back, although of larger conductor size and higher PSCC, look at how close this is to the supplying transformer.
This is what seperates us from the rest.
_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
#110166 - 03/08/06 05:51 PM Re: How would you have done this?
ShockMe77 Offline
Member

Registered: 06/11/05
Posts: 823
Loc: Rahway, New Jersey
That pipe has either got to go a few feet higher above the roof line, or put a 90ยบ bend before the roof line and run it out to the edge of the building (to the left of where it is now). The way that thing looks now is shameful.