#107077 - 11/05/04 08:22 PM Improper Tap, among other things
Webmaster Offline

Administrator
Member

Registered: 10/07/00
Posts: 3142
Loc: NY, USA
 Quote:
This was in a restaurant I went to trouble shoot tripping breakers. the panel is filled with twins, in a panel that isn't listed for, so now they have breakers burning the buss. I told them they have to change the panel, and clean up the violations.

- richard











Top
2014 / 2011 NEC & Related Books and Study Guides
#107078 - 11/05/04 08:43 PM Re: Improper Tap, among other things
Dave55 Offline
Member

Registered: 05/08/04
Posts: 666
Loc: Crystal Lake, Illinois, USA
That distribution panel looks overloaded with mini-breakers, Richard. I haven't heard the term "twins" before. That's a creative wire-tie in the second picture that didn't quite work.

They're really lucky the whole place didn't get totaled with all that cardboard nearby.

What's fed to the left through the wall???

Nice pictures!

Dave

Top
#107079 - 11/10/04 01:08 AM Re: Improper Tap, among other things
Big Jim Offline
Member

Registered: 07/18/03
Posts: 377
Loc: Denver, CO USA
Looks like its a real nice environment to work in, what with all the flypaper hanging around.

Top
#107080 - 11/10/04 03:15 AM Re: Improper Tap, among other things
electure Offline

Member

Registered: 12/24/00
Posts: 4226
Loc: Fullerton, CA USA
The tap to the panel on the left appears to be < 10'.
Does that panel have a main C/B?

Top
#107081 - 11/22/04 06:53 AM Re: Improper Tap, among other things
slumlordworker Offline
Member

Registered: 12/20/03
Posts: 88
Loc: south bend indiana
looks fun did you correct the 35 plus code violations. I would love to get atleast 2 jobs like this a week. at that rate I could retire in 10 years or so and put my kids in ivy league schools

on the real side what hack installed all that crap and did they know what they were doing or was it just here cash only

Top
#107082 - 12/14/04 08:29 PM Re: Improper Tap, among other things
trollog Offline
Member

Registered: 10/02/04
Posts: 273
Loc: San Diego California USA
anyone notice the order of precedence on those phases? last I checked it was Black-Red-Blue, top-to-bottom or left-to-right... I see red-blue-black

Top
#107083 - 12/15/04 02:46 PM Re: Improper Tap, among other things
Bill Addiss Offline
Member

Registered: 10/07/00
Posts: 4196
Loc: NY, USA
 Quote:
last I checked it was Black-Red-Blue, top-to-bottom or left-to-right... I see red-blue-black
On Long Island the norm is Blue - Black - Red. It is still the same sequence, but I haven't heard anyone else mention that order.

Bill

Top
#107084 - 12/16/04 09:37 PM Re: Improper Tap, among other things
trollog Offline
Member

Registered: 10/02/04
Posts: 273
Loc: San Diego California USA

Bill>

Hmm.. can't seem to find anything in the 2002 about that either except with 3 phase with a high leg, and that deals with orange.. Could this be a regional thing? I was always taught right-to-left, top-to-bottom black, red, blue... Am I out in left field on this one?

Top
#107085 - 12/16/04 09:39 PM Re: Improper Tap, among other things
trollog Offline
Member

Registered: 10/02/04
Posts: 273
Loc: San Diego California USA
Also, I am in California.. not Long Island.. if that makes a difference.

Top
#107086 - 12/16/04 11:33 PM Re: Improper Tap, among other things
rather_large_ben Offline
Member

Registered: 10/13/04
Posts: 13
at the toyota plant in fremont, ca, all the 480V stuff is black red blue, and the 120/208 stuff is brown, org, yel!

Top