#103605 - 10/04/02 03:42 AM Service, Before and After! How Many are Left?
Joe Tedesco Offline
Member

Registered: 10/07/00
Posts: 3325
Loc: Boston, Massachusetts USA
Sean B ..... Tell us your story here!



_________________________
Joe Tedesco, NEC Consultant

Top
2014 / 2011 NEC & Related Books and Study Guides
#103606 - 10/04/02 08:27 AM Re: Service, Before and After! How Many are Left?
sparky66wv Offline
Member

Registered: 11/17/00
Posts: 2339
Loc: West Virginia
Does the Receptacle below the panel comply with 406.8(A) (Being "like" an overhang or porch) or would it require a bubble as per 406.8(B)?

Not trying to be nit-picky, but I interpret "and the like" to mean any place protecting from a "driving rain".

And I think bubbles are ugly!

I'm going by memory here, do I have the code sections right?

Kudos on the use of PVC for the nipple!

[This message has been edited by sparky66wv (edited 10-04-2002).]
_________________________
-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI

Top
#103607 - 10/04/02 10:44 AM Re: Service, Before and After! How Many are Left?
Sean WB Offline
Member

Registered: 09/15/02
Posts: 113
Loc: South TX
IT actually is just under the panel Customer wanted to add Central A/C and a Spa on existing service anywho, that wall pictured was invaded by honeybees and was all warped, Note the black screws I used to try to straighten out to the right of meter base. AHJ passed the service for reconnect.yeah, I hate bubbles. we do not have to use them here, the plug just needs to be weatherproof when closed. When POCO came back, they used same old service wire from pole. That old wire is actually paralleled feeding two houses with 200A services!!!
One of the POCO guys remarked "I Guess we will have to upgrade our wire pretty soon,huh?"
*NOTE* the old ate up neutral that was reused for new service. These guys are really "above the law" I guess

[This message has been edited by Sean WB (edited 10-04-2002).]
_________________________
I did not get as think so badly as you shocked I did.

Top
#103608 - 10/04/02 10:51 AM Re: Service, Before and After! How Many are Left?
Sean WB Offline
Member

Registered: 09/15/02
Posts: 113
Loc: South TX
yeah sparky , I was trying to take a snap pic of the ground terminal in meter base, a subject you and I were discussing a while back. we have to bond them (EGC) to panel even if you use a rigid nipple. It was starting to rain after reconnect, so I hurried up and finished up I am going back for some more "cleaning up" of the electrical, I'll try and get a pic then.
_________________________
I did not get as think so badly as you shocked I did.

Top
#103609 - 10/04/02 05:02 PM Re: Service, Before and After! How Many are Left?
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
Nice job Sean.

looks like a 250-142(A)(1) GEC connection there in pix #1, does your area normally allow this?

good memory Virgil,
yeah ugly bubbles....stick way out, don't last, and no one really closes them down anyhow...

Top
#103610 - 10/04/02 06:05 PM Re: Service, Before and After! How Many are Left?
sparky Offline
Member

Registered: 10/18/00
Posts: 5545
Nice job Sean,

out of curiousity , is that the GEC i see wrapped around the old weaherhead and bugged onto the noodle?

Top
#103611 - 10/04/02 09:44 PM Re: Service, Before and After! How Many are Left?
Sean WB Offline
Member

Registered: 09/15/02
Posts: 113
Loc: South TX
Yep, Thats it , at least they coated it with some good 30 year paint
there was hardly a connection left. I wouldnt trust that to carry short circuit
_________________________
I did not get as think so badly as you shocked I did.

Top
#103612 - 10/04/02 10:05 PM Re: Service, Before and After! How Many are Left?
txsparky Offline
Member

Registered: 05/25/01
Posts: 578
Loc: Magnolia,.Texas U.S.A.
Sean are ya'll still running the GEC this way?Who's the poco there?
_________________________
Donnie

Top
#103613 - 10/05/02 02:38 AM Re: Service, Before and After! How Many are Left?
Sean WB Offline
Member

Registered: 09/15/02
Posts: 113
Loc: South TX
No, but I am runnig GEC to meter base and to panel as required, Im under the VEC cooperative.
The poco is apparantly worried that if the service neutral became open, which is likely under the conditions they leave their wire in , then there will be a fault path.
_________________________
I did not get as think so badly as you shocked I did.

Top
#103614 - 10/05/02 04:12 AM Re: Service, Before and After! How Many are Left?
walrus Offline
Member

Registered: 07/25/02
Posts: 671
Loc: Bangor Me. USA
Do you need a bubble if you don't have a permnament cord connected like an appliance,coke machine etc.???