ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 17
Recent Posts
Old decora style outlets
by Admin. 03/25/17 11:40 AM
ESA Arc flash course
by TheShockDoctors. 03/24/17 10:15 AM
fuse rejectors
by HotLine1. 03/24/17 07:53 AM
Another Forum Update
by Admin. 03/22/17 03:04 PM
Dining room plugs
by watersparkfalls. 03/21/17 10:31 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,479 Are you busy
166,185 Re: Forum
160,639 Need opinion
Who's Online Now
1 registered members (geoff in UK), 47 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#102807 - 11/29/06 08:16 PM 2 services or 1?  
u2slow  Offline
Member
Joined: Sep 2003
Posts: 200
Salt Spring, BC, Canada
I have an interesting project I've been brought into.

5 acre property. One main residence. One secondary mobile home (rental). One 5000sqft shop.

The main service will come into the shop. There is discussion over how it will be metered - i.e. how many meters, primary or secondary, etc. Another issue is building it to allow for a future genset & UPS - *mainly* for the primary residence, but some backup power for the rental and shop would be 'nice to have'.

So at least 3 different scenarios are on the table:

1) 2x primary metering. One for rental (100A). One for shop (300A). House is a sub off the main shop panel.

2) 2x secondary metering. 400A service in shop. 1 meter for rental. 1 meter for shop/house. Shop & house each have their own panel.

3) 3x primary metering (like duplex, but 3 meters). One individually metered service for each building.

Now I don't have enough experience with generators & transfer switches to see whch will be easiest to add backup power to, or what allowances would be good to do now.

Any input is appreciated.


Tools for Electricians:

#102808 - 12/04/06 10:01 PM Re: 2 services or 1?  
marsbar  Offline
Member
Joined: Apr 2006
Posts: 31
london, ont, canada
I have only worked on a couple of back up systems for our plant, not residential, but the feed from the poco comes in through the switch as does the generator and is monitored through the switch (if auto switch) then it could go out as you would like. You may want to look at your generator size first then how you would connect. This may not be very helpful but may start a string going.


#102809 - 12/11/06 12:45 AM Re: 2 services or 1?  
u2slow  Offline
Member
Joined: Sep 2003
Posts: 200
Salt Spring, BC, Canada
Thanks for the reply!

After a talking to a couple of other sparkies I know, I mostly went this way:

Quote

1) 2x primary metering. One for rental (100A). One for shop (300A). House is a sub off the main shop panel.


The 300A is now up to a full 400A to maximize the equipment. Separate triplex run in for the rental. I made sure there was a generous distance between the 400A splitter and the 200A switch (for the house) to accomodate a transfer switch and at a later date.



Member Spotlight
watersparkfalls
watersparkfalls
Washington...Not DC
Posts: 216
Joined: March 2005
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.010s Queries: 14 (0.003s) Memory: 0.7499 MB (Peak: 0.8728 MB) Zlib enabled. Server Time: 2017-03-26 09:16:44 UTC