ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 16
Recent Posts
ESA Arc flash course
by TheShockDoctors. 03/24/17 10:15 AM
fuse rejectors
by HotLine1. 03/24/17 07:53 AM
Another Forum Update
by Admin. 03/22/17 03:04 PM
Dining room plugs
by watersparkfalls. 03/21/17 10:31 PM
TRUE POWER
by jraef. 03/21/17 09:13 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,352 Are you busy
166,085 Re: Forum
160,550 Need opinion
Who's Online Now
1 registered members (HotLine1), 58 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#102074 - 12/09/04 03:03 PM sevice entrance  
GETELECTRIC  Offline
Member
Joined: Oct 2003
Posts: 172
toronto canada
I,m changing an old industriul unit into three lofts.I,m using the existing incoming 600v fusible disconnect which feeds a 225kva transformer which then feeds a 800amp metering section.My question is do I need a disco in between the transformer and metering board or does the 600v main disco cover this.


Tools for Electricians:

#102075 - 12/09/04 04:11 PM Re: sevice entrance  
Tony Moscioni  Offline
Moderator
Joined: May 2001
Posts: 144
CANADA
The main disconnect should be fine until you get to the 800-amp 208-volt splitter.

Then you will have to install disconnect switches for each separate service, with or without utility or check meters, for the different lofts.

Tony Moscioni
Electrical Inspector
Electrical Safety Authority


#102076 - 12/10/04 09:29 AM Re: sevice entrance  
GETELECTRIC  Offline
Member
Joined: Oct 2003
Posts: 172
toronto canada
Thanks Tony thats what I thought.



Member Spotlight
Samurai
Samurai
Fl.
Posts: 46
Joined: May 2007
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 14 (0.003s) Memory: 0.7486 MB (Peak: 0.8716 MB) Zlib enabled. Server Time: 2017-03-25 00:05:12 UTC