The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!


2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
Son of Sparky
by HotLine1
Yesterday at 07:43 PM
Speaking of Plugmold ...
by gfretwell
10/17/16 02:37 PM
Broken battery charger? Check for cobwebs!
by gfretwell
10/17/16 02:30 PM
230 or 345 kV transmission lines?
by annemarie1
10/12/16 01:23 PM
Is this a fix or just a bandaid?
by gfretwell
10/10/16 06:49 PM
New in the Gallery:
12.5A through 0.75mm flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 11
HotLine1 6
renosteinke 6
ghost307 5
sparky 4
Who's Online
1 registered (Radar), 321 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#102049 - 10/29/04 03:40 PM Permit??
aspencade Offline

Registered: 10/19/04
Posts: 13
Loc: BC Canada
What is the minimum upgrade of electrical equipment and or grounding etc if a panel only is being replaced because of an emergency repair? Is a permit required if work is done by an electrical contractor? cross-reference Section 18 (5)(a,b,c) of new Safety Standards Act and how it may or may not apply. How about it Tony...what do you say?

2014 / 2011 NEC & Related Books and Study Guides
#102050 - 10/31/04 02:49 PM Re: Permit??
Tony Moscioni Offline

Registered: 05/15/01
Posts: 144

I could tell you what it is, and what it should be for Ontario.

For British Columbia, you should call the AHJ for a more precise answer.

Electrical Inspections in BC fall under the Electrical Safety Act, [RSBC 1996] CHAPTER 109.

A chief inspector and electrical inspectors are required for this Act and are appointed under the Public Service Act.

Inspection service delivery falls under the jurisdiction of each city, municipality or regional district.

Ontario Fee Schedule (2004' Electrical Inspection Wiring Fees)

Consumer Service (Section 4.3)
This Section covers instances when the only change being made is to the consumer service, panel or meter.

If additional changes are also being made, apply the fee set out in the Section on
Additions or Alteration to Existing Structures (reference Section 4.2.1).
New Service (to an existing structure), Service Change, Panel Change and Service Repairs

(Section 4.3.1)
The fee for an inspection is:
• for a contractor, $60 for one visit.
• for a non-contractor, the fee is $107 for one visit.

Industrial/Commercial/Institutional and Agricultural Fees for
Inspection Services

Low Voltage (less than or equal to 750 volts) (Section 5.1.2)

The fee for establishing, repairing, or altering permanent consumer service (including metered subs off the main service) includes an initial fee as well as a fee for any additional items (as defined in Section 5.5).

The fees for Low Voltage consumer service and for metering changes(from individual to bulk or bulk to individual) are priced below:

Amperes Initial Fee
0-225A $69
226A-799A $111
800A or greater $248

Tony Moscioni
Electrical Inspector
Electrical Safety Authority