Posted By: Admin Conduit Violations - 06/25/05 09:23 PM
(submitted via Joe Tedesco)
Quote
The first two are an easy code violation to pick out.

I don't know if you can see the last picture but a contractor did a real neat job in Rigid Metal Conduit and our local utility company took PVC with the flange end on and put it on the RMC. I asked the contractor and he said he left threads on the end of his pipe.

-JoeRossi
[Linked Image]

[Linked Image]

[Linked Image]
Posted By: walrus Re: Conduit Violations - 06/25/05 10:37 PM
As far as the third pic goes, I see that all the time in Maine, the utility can do whatever it wants.
Posted By: iwire Re: Conduit Violations - 06/25/05 10:57 PM
I agree with Walrus on the third pic. it is pointless to try to apply the NEC to an installation governed by the NESC.

They could have just as well run plastic "U Guard". Personally between U-Guard and the PVC I would rather the PVC. [Linked Image]
Posted By: mvpmaintman Re: Conduit Violations - 07/04/05 10:00 PM
At least the bell end of the fitting is down, so that the water will go over the pipe and not into it
Posted By: Trumpy Re: Conduit Violations - 07/05/05 09:11 PM
mvp,
It could still rise up through Capillary effect, obviously not in the same amount. [Linked Image]