POCO worker - 10/05/04 11:11 PM
I recently did a service upgrade that involved replacing a pedestal meter socket. We scheduled an 8 am disconnect, which didn't happen until 11 am (our POCO isn't what it used to be). Around 4 when we were ready to connect, the POCO guy asks if I'm ready (Yes, I am).
However, instead of coming to crimp the lugs on the lines and install them in the meter socket, he's going to reconnect power to the lines. I yelled at him that I wasn't ready for THAT, since the lines were laying on the ground taped together. I can't believe that he didn't even look over to see if it was connected. This guy is an accident waiting to happen.
Dave
However, instead of coming to crimp the lugs on the lines and install them in the meter socket, he's going to reconnect power to the lines. I yelled at him that I wasn't ready for THAT, since the lines were laying on the ground taped together. I can't believe that he didn't even look over to see if it was connected. This guy is an accident waiting to happen.
Dave