Did I go overboard? - 08/22/04 12:43 PM
A contractor has a situation where he called our company (inspection company)to help him lay out a service installation in an existing service room.
We discussed some stuff, but needed to see inside the main service switchboard, which meant taking the cover off of the 480/277v gear. They had no PPE with them, so I told them I would gladly come back and take a look when they provided all of us with the proper PPE that is necessary. They didn't get too upset, but I heard through the grapevine that they were upset at the time delay it is causing. I see this as a necessary lession to start pushing in our industry, what do you think?
Pierre
We discussed some stuff, but needed to see inside the main service switchboard, which meant taking the cover off of the 480/277v gear. They had no PPE with them, so I told them I would gladly come back and take a look when they provided all of us with the proper PPE that is necessary. They didn't get too upset, but I heard through the grapevine that they were upset at the time delay it is causing. I see this as a necessary lession to start pushing in our industry, what do you think?
Pierre