my first final was sort of "anti-climactic". only took about 5 minutes.
after getting "gigged" for a couple of items, on my "rough-in", when i got ready for the final, i was stressed out beyond belief. i called to make the appointment with the inspector, and waited all day for him to show up.. all the while, double-checking, triple checking, etc., while driving my crew nuts. the inspector showed up about 3:30 p.m., looked at my drawings, walked around a bit, asked me a couple of questions about my grounding system, signed off, and left....about 5 to 10 minutes at the most. as he was driving away, i thought, "is that it? thats all there is?" lol.. i only wish that some of my others had gone so quickly and smoothly...
gramps