Posted By: HotLine1 How long to get a permit??? - 11/13/02 09:27 PM
I was wondering how long it takes to get an electrical permit where you guys are??
Small jobs, and large jobs.
Are plans required for "small jobs", and if so are plans drawn up by the EC accepted??
Do you have "Plan Review" in your areas??
John
Posted By: mj Re: How long to get a permit??? - 11/13/02 10:38 PM
walk in, of fax in a request for a permit, pay up to 7 days later,
Posted By: Electricmanscott Re: How long to get a permit??? - 11/14/02 02:28 AM
Mass: Give us the money we'll give you the permit. Generally that simple.
Posted By: Nick Re: How long to get a permit??? - 11/14/02 03:04 AM
Any jurisdiction in California (that I have experience with)
Submit plans to plan check. Start building the job because the schedule is tight and the general is pushing. 1 month later> still waiting for plans to come out of plan check< Job is now at the point where thing need to be covered up. All the owners reps state in the meetings how they will get the permit pushed thru in the next couple of days. (Because this client is so important and has so much clout you know) >3 more weeks go by< job is at stand still because there is still no permit issued and owners reps have pissed of the AHJ. They refuse to do courtesy inspections. About this time plans come back from plan check usually with comments and stamped "revise and re submit." Resubmitals usually don't take to long if there are not to many corrections. By this time there has been multiple changes to the job and the current drawings don't match the submited drawings any way. [Linked Image]
Basically 6 to 8 weeks for plan check review and issuance of a permit for medium to large commercial job. Then, you have to deal with the utility design engineers for there requirements and design. I better not even get started on that! [Linked Image] [Linked Image]

[This message has been edited by Nick (edited 11-13-2002).]
Posted By: Scott35 Re: How long to get a permit??? - 11/14/02 05:34 AM
Nick,

LOL!!! ROTFLOL!!!

I'm gonna copy / paste that text and print it !!! (with your permission, of course [Linked Image]...)

Scott s.e.t.
Posted By: Nick Re: How long to get a permit??? - 11/15/02 12:04 AM
Sure Scott. No problem. I was just feeling cynical last night. [Linked Image]
Posted By: electure Re: How long to get a permit??? - 11/15/02 12:41 AM
Nick, you're not cynical, you're an incredible optimist!!
Add to this working by the beach, Coastal Commission, etc.
How about an endangered bug or toad?
On the converse, I walked into the City of Montebello for a TI permit involving quite a bit of machinery, plans (3 sets) in hand...and walked out with a permit.

Yes, the truth comes out after the "prejob" meetings. "RFI's will be answered in a day" (I've waited 4 months).
I usually take a minirecorder into job meetings, turn it on, and set it in the middle of the table. It makes some of the other guys mad, but it sure cuts down on the BS.
Posted By: fedup Re: How long to get a permit??? - 11/15/02 10:18 AM
Tape recorder at a progress meeting?I'll bet the GC doesn't like that.As far as permits around here we can put money up front with the inspection department and phone or fax in permit requests for smaller jobs ie service upgrades new spec homes and small commercial.As for plan revue as long as the plans are on file the inspectors assume you have the intent of purchasing a permit and will grant an inspection.Any questions or concerns the inspector has about design issues will be noted at inspection time and passed on in written form to the plan revue board,the GC,the owners rep and the electrical contractor.This sure helps when it comes to change orders to correct drawing errors
Posted By: Electric Eagle Re: How long to get a permit??? - 11/16/02 12:28 AM
The electrical permit is always just walk in, pay fee, get permit. It can be quite diferent for the GC to get the main permit. On a City of Atlanta job we're wiring the city approved the plans and issued the permit for a detached 3 car garage and apartment. Then the building inspector slapped a stop work order after at the drywall stage and ordered them to go back to review. In the end, they had to get a variance because the project was 3% larger than allowed in comparison to the main house.
Posted By: The Watt Doctor Re: How long to get a permit??? - 11/16/02 12:43 AM
I get online......browse through the ECN forum....drink coffee...etc...etc. Then, I bump over to the City of Houston web site, log in, fill out the form, pay with a credit card, and usually have the permit in a matter of hours, via fax. If for some reason the inspector requires additional permits, he will tell me as the job progresses. We used to have to go downtown, and stand in line. I love the internet.

Regards,
Doc
Posted By: HotLine1 Re: How long to get a permit??? - 11/18/02 12:49 AM
Talk about "progress":
Permits accepted by fax.......
Permits on the internet.......

Guys, here in NJ, I am not aware of any areas using the modern methods.
The State UCC, and the Board of Examiners require that the permit apps be sealed and signed by the license holder, or an authorized employee of the licensee. Guess you guys with the fax and new priveleges don't have seals??

Seems that most areas the permits are readily available.

Dependent on the individual town/city here in NJ, you may get a resi permit ASAP, if there is an AHJ "in" to price it and sign it "approved". Usually, it takes a "few" days.
Plan review is "limited" to being completed within 20 days, per state rules; but sometimes it takes "longer"..

John
Posted By: nesparky Re: How long to get a permit??? - 11/18/02 04:44 AM
go down to city hall and have permit in hand paid for when i walk out. The only hold up is if the general does not have building permit. or
fax in form and credit card authorization and city will (snail) mail the permit and reciept. or
one city has a fund deposit plan, as long as you have the funds in your account you can e mail your permit app and it will be mailed to you. Account is password protected. They also send you a monthly statement any time you had any account activity.
Plan checks belong to the general or owner except for design build. If design build then once your plans are approved the you can get permit.
Longest time I have had to wait for a permit was 3 days.